Skip to Content.
Sympa Menu

usatlas-hllhc-l2deputymgmt-nsf-l - Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Variance reports are due!

usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov

Subject: U.S. ATLAS HL-LHC Upgrade Level 2 and Deputies-NSF only Management Mailing List

List archive

Chronological Thread  
  • From: Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu>
  • To: usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
  • Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Variance reports are due!
  • Date: Fri, 24 Sep 2021 13:54:58 -0400


Hello all,

Thanks for the quick reaction.

-6.4.1 looks good

-6.4.2 still missing

-all of 6.6 looks good

-all of 6.8 still missing.

Best,

Gustaaf




On 9/23/21 3:31 PM, Gustaaf Brooijmans wrote:

Hello all,

A reminder that variance reports are due.

-6.4.1 and 6.4.2 are missing

-6.6 is missing, 6.6.3 and 6.6.4 look good (for 6.6.4 maybe avoid saying "there is no corresponding schedule variance" since schedule and cost variances are independent)

-6.8. 6.8.2 and 6.8.3 are missing

Please fill out the missing reports asap.

Thx

Gustaaf
_______________________________________________
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l


--
Gustaaf Brooijmans - Columbia University
@Columbia: (212) 854 4527; Nevis virtual phone: (914) 591 2804

Als sie mich holten,
gab es keinen mehr, der protestieren konnte.




Archive powered by MHonArc 2.6.24.

Top of Page