Skip to Content.
Sympa Menu

usatlas-hllhc-l2deputymgmt-nsf-l - [Usatlas-hllhc-l2deputymgmt-nsf-l] National Science Foundation- ATLAS Detector High Luminosity Upgrade DRAFT for fact checking-gb.docx

usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov

Subject: U.S. ATLAS HL-LHC Upgrade Level 2 and Deputies-NSF only Management Mailing List

List archive

Chronological Thread  
  • From: Michael Tuts <tuts AT pmtuts.net>
  • To: "Coles, Mark W." <mcoles AT nsf.gov>
  • Cc: "usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
  • Subject: [Usatlas-hllhc-l2deputymgmt-nsf-l] National Science Foundation- ATLAS Detector High Luminosity Upgrade DRAFT for fact checking-gb.docx
  • Date: Thu, 27 Apr 2023 14:05:56 +0000

Dear Mark,

 

Attached is a version of the panel draft report you provided with tracking changes on. We have made some typo corrections, some minor edits, and some clarifications for your consideration. The L2 managers have reviewed their sections and do not have any factual corrections to make. Let us know if you need anything else.

 

Best, Mike

Attachment: National Science Foundation- ATLAS Detector High Luminosity Upgrade DRAFT for fact checking-gb.docx
Description: National Science Foundation- ATLAS Detector High Luminosity Upgrade DRAFT for fact checking-gb.docx




Archive powered by MHonArc 2.6.24.

Top of Page