Skip to Content.
Sympa Menu

usatlas-hllhc-lartl2l3-l - Re: [Usatlas-hllhc-lartl2l3-l] L2 talk draft slides

usatlas-hllhc-lartl2l3-l AT lists.bnl.gov

Subject: U.S. ATLAS HL-LHC Upgrade LAr Level 2 and Level 3 Managers Mailing List

List archive

Chronological Thread  
  • From: "Ma, Hong" <hma AT bnl.gov>
  • To: "Parsons, John" <parsons AT nevis.columbia.edu>, "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
  • Subject: Re: [Usatlas-hllhc-lartl2l3-l] L2 talk draft slides
  • Date: Mon, 13 Jun 2022 03:03:37 +0000

 

                I also updated my slides too.

 

                In addition, I uploaded BOE and traceability table, which should be uploaded to docdb soon.

 

                A couple of comments on John’s slides.

 

Slide 16: KPP. 

                In a later version of the KPP, Jon revised the threshold for LAr to be

 “Perform system integration of the liquid argon front-end boards (FEB2) and back-end electronics.”

 

               

Slide 20:   Penka confirmed the April change includes those in BCP75. 

 

                Best,

 

                Hong.

 

 

 

 

From: Usatlas-hllhc-lartl2l3-l <usatlas-hllhc-lartl2l3-l-bounces AT lists.bnl.gov> on behalf of John Parsons <parsons AT nevis.columbia.edu>
Date: Sunday, June 12, 2022 at 2:01 PM
To: usatlas-hllhc-lartl2l3-l AT lists.bnl.gov <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
Subject: Re: [Usatlas-hllhc-lartl2l3-l] L2 talk draft slides


I also uploaded to the same Indico a draft of my Intro slides for the
breakout session which, as requested and done at the previous review, is
used to provide some more context about the NSF scope.  (Note I opted
not to bother to change these slides to widescreen format, since not
doing so saved a lot of time and it is anyway not a "main" talk at the
DOE review.)

                John

On 6/11/22 6:00 PM, John Parsons wrote:
>
> Hi all,
>
>      I have an essentially complete draft of my L2 talk slides for the
> upcoming DOE DR. I uploaded them to last Friday's weekly meeting at
> https://indico.bnl.gov/event/16192/.  I uploaded in .pptx format to make
> it easier if Hong/Hao need to copy anything from it, and in particular
> the updated schedule summary plot on p.24.
>      Comments are welcome.
>      Regards,
>          John

--
______________________________________________________________________

John Parsons
Nevis Labs,              Email: parsons AT nevis.columbia.edu
  Columbia University   Phone: (914) 591-2820
P.O. Box 137            Fax: (914) 591-8120
Irvington, NY 10533     WWW: https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!AmC7EaIOfzXjdgEF1M5AuZCUDH1E_4_XB2wZLw7QuX4XRaqm9VtRb2Lp22slexivR4Rfuf1_XuUKA2e1XbVyp-94zLLR03_qxAHTcJN2np1N4Q$       

______________________________________________________________________
_______________________________________________
Usatlas-hllhc-lartl2l3-l mailing list
Usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-lartl2l3-l

Attachment: KPP CD23 DR May2022 v3b.docx
Description: KPP CD23 DR May2022 v3b.docx




Archive powered by MHonArc 2.6.24.

Top of Page