Skip to Content.
Sympa Menu

usatlas-hllhc-lartl2l3-l - Re: [Usatlas-hllhc-lartl2l3-l] weekly mtg (at slightly shifted time)

usatlas-hllhc-lartl2l3-l AT lists.bnl.gov

Subject: U.S. ATLAS HL-LHC Upgrade LAr Level 2 and Level 3 Managers Mailing List

List archive

Chronological Thread  
  • From: Tim Andeen <tandeen AT utexas.edu>
  • To: "Ma, Hong" <hma AT bnl.gov>
  • Cc: "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
  • Subject: Re: [Usatlas-hllhc-lartl2l3-l] weekly mtg (at slightly shifted time)
  • Date: Sun, 26 Mar 2023 15:19:32 -0500

Hi Hong, 

Slide 9:  Should you include Stroynowski also on the row for SMU, in sync with the org chart update?


I dont see a new org chart yet. If we dont have one by tomorrow evening Ill add it by hand. 


Slide 14:  There are two FDRs on the same slides, with two different meanings.  First one for FDR of ADC in ATLAS and second one for NSF FDR of the project.  Maybe using ATLAS-FDR and NSF-FDR?


Good point. Fixed. 


Slide 17: “Main goals for your FEE”


Thanks. 


Slide 20: This only covers ADC.  What about optics? Will lpGBT and VL+ be tested at SMU?  Slide 17 does say “production qualification” for optics.


Split slide into ADC and Optics. For Optics added "Optics: Preparations in progress for testing fiber connectors for VTRx+.  Note: lpGBT and VL+ are purchased from CERN already QC tested.” 


Slide 23:  Title says “realized risks”, but the list includes retired risks without realization.  How about Realized and Retired Risks”?


I like your suggestion and changed the title. But it might get changed back to match others… 


Slide 28:   Did you actually return resources back to the project ? If so, was it associated with a BCP?


Ah, no I have not. What do you think, should this be removed? This essentially happened since we submitted the chip, so can I say this would be realized in the current rebaselining? 



Best, Tim 



_______________________________________________________
Tim ANDEEN (he/him) | Associate Professor | Department of Physics     
College of Natural Sciences | The University of Texas at Austin
tandeen AT utexas.edu | tandeen.web.cern.ch
office (TX) PMA 10.208 | (CERN)  304/1-024
ph (TX):  +1 512 475-9575 | (CERN): +41 (0)22 76 758 14
_______________________________________________________


On Mar 26, 2023 at 8:56:47 AM, "Ma, Hong" <hma AT bnl.gov> wrote:

Hi Tim,

 

                A few comments on the slides you posted on the indico.

 

Slide 9:  Should you include Stroynowski also on the row for SMU, in sync with the org chart update?

Slide 14:  There are two FDRs on the same slides, with two different meanings.  First one for FDR of ADC in ATLAS and second one for NSF FDR of the project.  Maybe using ATLAS-FDR and NSF-FDR?

Slide 17: “Main goals for your FEE”

Slide 20: This only covers ADC.  What about optics? Will lpGBT and VL+ be tested at SMU?  Slide 17 does say “production qualification” for optics.

Slide 23:  Title says “realized risks”, but the list includes retired risks without realization.  How about Realized and Retired Risks”?
Slide 28:   
Did you actually return resources back to the project ? If so, was it associated with a BCP?

 

                Best,

 

                Hong.

 

 

 

 

 

From: Usatlas-hllhc-lartl2l3-l <usatlas-hllhc-lartl2l3-l-bounces AT lists.bnl.gov> on behalf of Tim Andeen <tandeen AT utexas.edu>
Date: Friday, March 24, 2023 at 3:00 PM
To: Andy Haas <andy.haas AT nyu.edu>, Parsons, John <parsons AT nevis.columbia.edu>
Cc: usatlas-hllhc-lartl2l3-l AT lists.bnl.gov <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
Subject: Re: [Usatlas-hllhc-lartl2l3-l] weekly mtg (at slightly shifted time)

Hi all, I’ve posted a draft of my slides to today’s agenda: L3-6.4.1 LAr FEE-v2.1.pdf.

 

On the todo list for next week are updating the org chart and adding the charge boxes. 

 

 

-Tim

On Mar 24, 2023 at 12:36:34 PM, Andy Haas <andy.haas AT nyu.edu> wrote:

My availability for a practice Drill Down...
March 3 - no
March 4 - Free before 11am and from 12-3pm
March 5 - Free from 1-5pm
March 6 - no
March 7 - Free all day

On Thu, Mar 23, 2023 at 8:47 AM John Parsons <parsons AT nevis.columbia.edu> wrote:

 

 

Hi all,

 

        We will meet tomorrow.  However, to work around an ongoing LBNC meeting

I am involved with, I need us to meet starting at 1 pm EST (instead of

the usual 12:30 pm); ie. 30 minutes later than usual.  I hope that is OK

for everyone.

        It is important we meet tomorrow to discuss preparations for the NSF

review.  In particular, the talks (updated as needed from the version at

the recent Director's Review) need to be posted by COB on Monday.

        I have created an Indico link at https://urldefense.proofpoint.com/v2/url?u=https-3A__indico.bnl.gov_event_18898_&d=DwICAg&c=slrrB7dE8n7gBJbeO0g-IQ&r=y4qQBOsjsdgJNx-_8SvpS9786vHE4GOddPXp1ozJgWc&m=sMr4GuNiubf5rW1gMm6CRLhdE7lqW_EkOxKeYVgAypFnprsWYb9FlLbB6w6QNz8K&s=trZ3gGprgcobxPJS6x4O4REPGRjRsT21uGbJsPmJeDc&e= .

 

        Regards,

                John

--

______________________________________________________________________

 

John Parsons

Nevis Labs,             Email: parsons AT nevis.columbia.edu

  Columbia University   Phone: (914) 591-2820

P.O. Box 137            Fax: (914) 591-8120

Irvington, NY 10533     WWW: https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!AQSRsB117Kxjl8oeWU4y1RSRIFAVUGwOOD-Y_TGd5qjkEkbHzW8spHkokbZYy7Jnqie3HLo7-p4NY3tCM6n8UkajC1Lw1iyRIQToxQN9C-HyIg$

 

______________________________________________________________________

_______________________________________________

Usatlas-hllhc-lartl2l3-l mailing list

Usatlas-hllhc-lartl2l3-l AT lists.bnl.gov

https://urldefense.proofpoint.com/v2/url?u=https-3A__lists.bnl.gov_mailman_listinfo_usatlas-2Dhllhc-2Dlartl2l3-2Dl&d=DwICAg&c=slrrB7dE8n7gBJbeO0g-IQ&r=y4qQBOsjsdgJNx-_8SvpS9786vHE4GOddPXp1ozJgWc&m=sMr4GuNiubf5rW1gMm6CRLhdE7lqW_EkOxKeYVgAypFnprsWYb9FlLbB6w6QNz8K&s=C8jyk4ZhnAk6lPtZ5-smAT5p0mG95Uvw4jFGiyxvTQE&e=

_______________________________________________
Usatlas-hllhc-lartl2l3-l mailing list
Usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-lartl2l3-l

_______________________________________________
Usatlas-hllhc-lartl2l3-l mailing list
Usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-lartl2l3-l



Archive powered by MHonArc 2.6.24.

Top of Page