Skip to Content.
Sympa Menu

usatlas-hllhc-lartl2l3-l - Re: [Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2l3ics-l] May 2024 Status Sheets

usatlas-hllhc-lartl2l3-l AT lists.bnl.gov

Subject: U.S. ATLAS HL-LHC Upgrade LAr Level 2 and Level 3 Managers Mailing List

List archive

Chronological Thread  
  • From: Timothy Robert Andeen <timothy.robert.andeen AT cern.ch>
  • To: John Parsons <parsons AT nevis.columbia.edu>, "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
  • Subject: Re: [Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2l3ics-l] May 2024 Status Sheets
  • Date: Wed, 22 May 2024 12:25:30 +0000

Hi John,

 

Status updated and bullets below.

ADC

  • Production wafers arrived at CERN. Arranging shipment to packager.
  • PRR scheduling planned for June.
  • Packager (JCET) contacted and ready. Requesting to package the additional engineering run wafers and 2 wafers from each of the 2 production lots (before PRR).
  • Robotic test-stand (RTS) integration work ongoing and soft-walled clean room deployed and in use. 
  • Mass test boards at Austin integrated in robotic setup. Repeatability of testing studies showed initial issues with repeatability. Board and firmware debugging has made significant improvements. Investigating socket as possible source of issue. Good performance with combination of clean room, socket cleaning, and now identifying the precise source of the improvement. 
  • Coordination with Saclay on QC parameters ongoing, discussions continue as we understand the test setup reliability. 

OPTICS:

  • Investigating measurements of spectrum of light emitted by VTRx during QC testing. With firefly in lab considering two setups, one with data-only links to splitter to test with optical spec. analyzer and a second testing the control links, similar setup. Evaluating purchase of optical spectrum analyzer.
  • Initial batch of 345 VTRx+ delivered from CERN and under test.
  • Control code in development. 
  • Student testers hired, and training ongoing.
  • Fiber placement on board under study. Discussions with FEB2 designers on exact placement of fiber saddles, holes for saddles and connectors, with modules in the lab with 37 cm pigtails attached. Placement scheme agreed on. 

 

 

From: Usatlas-hllhc-lartl2l3-l <usatlas-hllhc-lartl2l3-l-bounces AT lists.bnl.gov> on behalf of John Parsons <parsons AT nevis.columbia.edu>
Date: Monday, May 20, 2024 at 5:50 PM
To: usatlas-hllhc-lartl2l3-l AT lists.bnl.gov <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
Subject: [Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2l3ics-l] May 2024 Status Sheets

       
Hi all,

        It is status and technical bullets time again.  Please complete both
before our meeting on Friday.
        Thanks,
                John

-------- Forwarded Message --------
Subject:         [Usatlas-hllhc-l2l3ics-l] May 2024 Status Sheets
Date:    Mon, 20 May 2024 14:58:06 +0000
From:    Smith, Rosemarie <rsmith2 AT bnl.gov>
To:      Usatlas-hllhc-l2l3ics-l AT lists.bnl.gov
<usatlas-hllhc-l2l3ics-l AT lists.bnl.gov>



Good morning,

*If you need help, please DO NOT reply to the mailing list*

The Gantt Charts for each subsystem has been uploaded in *DocDB 976*.
Please make sure to look over them while statussing the activities.

Status sheets for May 2024 are now available in google docs:

*Please note: The activities with baseline start dates in the past are
highlighted in orange so you can see how this will impact your monthly
performance.***

   * *6.01 Pixels:
 
*https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/10vYRsYJYdiXyOs9GyAzzqWP2OdMDEEeH8ttbtnPFLXs/edit?usp=sharing__;!!P4SdNyxKAPE!FTlmUxpcbp8fUAq8FcEzarpVsw9MhwFnUJrwcAMgcqWznwLP9yeIcSxNTlFXkiC6PoxocwFjfLtEn0IF9BSjxMop4MM5de0POVjO5yDgS6466Q$
 
<https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/10vYRsYJYdiXyOs9GyAzzqWP2OdMDEEeH8ttbtnPFLXs/edit?usp=sharing__;!!P4SdNyxKAPE!FTlmUxpcbp8fUAq8FcEzarpVsw9MhwFnUJrwcAMgcqWznwLP9yeIcSxNTlFXkiC6PoxocwFjfLtEn0IF9BSjxMop4MM5de0POVjO5yDgS6466Q$ >

   * *6.02 Strips*:
 
https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1-flOiD6PrHlIWhvjB2bF0IRS1ELHot20APVuhKPEARI/edit?usp=sharing__;!!P4SdNyxKAPE!FTlmUxpcbp8fUAq8FcEzarpVsw9MhwFnUJrwcAMgcqWznwLP9yeIcSxNTlFXkiC6PoxocwFjfLtEn0IF9BSjxMop4MM5de0POVjO5yCxhoVCAw$
 
<https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1-flOiD6PrHlIWhvjB2bF0IRS1ELHot20APVuhKPEARI/edit?usp=sharing__;!!P4SdNyxKAPE!FTlmUxpcbp8fUAq8FcEzarpVsw9MhwFnUJrwcAMgcqWznwLP9yeIcSxNTlFXkiC6PoxocwFjfLtEn0IF9BSjxMop4MM5de0POVjO5yCxhoVCAw$ >

   * *6.03 Global Mechanics:
 
*https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/11zWpQcP_DjHVfpK3QfPGQxvBMXS5gA55YGI5-CX8FIE/edit?usp=sharing__;!!P4SdNyxKAPE!FTlmUxpcbp8fUAq8FcEzarpVsw9MhwFnUJrwcAMgcqWznwLP9yeIcSxNTlFXkiC6PoxocwFjfLtEn0IF9BSjxMop4MM5de0POVjO5yAx6RvynQ$
 
<https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/11zWpQcP_DjHVfpK3QfPGQxvBMXS5gA55YGI5-CX8FIE/edit?usp=sharing__;!!P4SdNyxKAPE!FTlmUxpcbp8fUAq8FcEzarpVsw9MhwFnUJrwcAMgcqWznwLP9yeIcSxNTlFXkiC6PoxocwFjfLtEn0IF9BSjxMop4MM5de0POVjO5yAx6RvynQ$ >

   * *6.04
 
Lar:*https://docs.google.com/spreadsheets/d/1L7znnUYOBAoN6WUyRYcXBJkeur-mllMs1Ylef7OFZ3c/edit?usp=sharing
 
<https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1L7znnUYOBAoN6WUyRYcXBJkeur-mllMs1Ylef7OFZ3c/edit?usp=sharing__;!!P4SdNyxKAPE!FTlmUxpcbp8fUAq8FcEzarpVsw9MhwFnUJrwcAMgcqWznwLP9yeIcSxNTlFXkiC6PoxocwFjfLtEn0IF9BSjxMop4MM5de0POVjO5yDPevmDNg$ >

   * *6.05
 
Tiles:*https://docs.google.com/spreadsheets/d/15mtVqSWPeq0JIKg1Qpo_HYOZMsmIEgoFjLLP6Ko_wn0/edit?usp=sharing
 
<https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/15mtVqSWPeq0JIKg1Qpo_HYOZMsmIEgoFjLLP6Ko_wn0/edit?usp=sharing__;!!P4SdNyxKAPE!FTlmUxpcbp8fUAq8FcEzarpVsw9MhwFnUJrwcAMgcqWznwLP9yeIcSxNTlFXkiC6PoxocwFjfLtEn0IF9BSjxMop4MM5de0POVjO5yBDPf-jsg$ >

   * *6.06
 
Muons:*https://docs.google.com/spreadsheets/d/1_T1hK5ZhBfQtm29GGes3H-bsr9ynnxVD05mGmEv8dUQ/edit?usp=sharing
 
<https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1_T1hK5ZhBfQtm29GGes3H-bsr9ynnxVD05mGmEv8dUQ/edit?usp=sharing__;!!P4SdNyxKAPE!FTlmUxpcbp8fUAq8FcEzarpVsw9MhwFnUJrwcAMgcqWznwLP9yeIcSxNTlFXkiC6PoxocwFjfLtEn0IF9BSjxMop4MM5de0POVjO5yAVL70D4A$ >

   * *6.07 DAQ:
 
*https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1J0ElXuLo6D6uVpyWEE7U1xWFoD72Q9DuGjjs_pItmHk/edit?usp=sharing__;!!P4SdNyxKAPE!FTlmUxpcbp8fUAq8FcEzarpVsw9MhwFnUJrwcAMgcqWznwLP9yeIcSxNTlFXkiC6PoxocwFjfLtEn0IF9BSjxMop4MM5de0POVjO5yAM5SXzWw$
 
<https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1J0ElXuLo6D6uVpyWEE7U1xWFoD72Q9DuGjjs_pItmHk/edit?usp=sharing__;!!P4SdNyxKAPE!FTlmUxpcbp8fUAq8FcEzarpVsw9MhwFnUJrwcAMgcqWznwLP9yeIcSxNTlFXkiC6PoxocwFjfLtEn0IF9BSjxMop4MM5de0POVjO5yAM5SXzWw$ >

   * *6.08 Trigger:
 
*https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1ELlfQRW1rMXs3BjiIUmHJEwAqKbCRKuY9Nk6bWjNATI/edit?usp=sharing__;!!P4SdNyxKAPE!FTlmUxpcbp8fUAq8FcEzarpVsw9MhwFnUJrwcAMgcqWznwLP9yeIcSxNTlFXkiC6PoxocwFjfLtEn0IF9BSjxMop4MM5de0POVjO5yA6BiJEsg$
 
<https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1ELlfQRW1rMXs3BjiIUmHJEwAqKbCRKuY9Nk6bWjNATI/edit?usp=sharing__;!!P4SdNyxKAPE!FTlmUxpcbp8fUAq8FcEzarpVsw9MhwFnUJrwcAMgcqWznwLP9yeIcSxNTlFXkiC6PoxocwFjfLtEn0IF9BSjxMop4MM5de0POVjO5yA6BiJEsg$ >

   * *6.11 Installation &
 
Integration:*https://docs.google.com/spreadsheets/d/1H2iX9hfZ-dJh4GW103ozmQGrWBbIpbuFJfLN2N-0tC8/edit?usp=sharing
 
<https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1H2iX9hfZ-dJh4GW103ozmQGrWBbIpbuFJfLN2N-0tC8/edit?usp=sharing__;!!P4SdNyxKAPE!FTlmUxpcbp8fUAq8FcEzarpVsw9MhwFnUJrwcAMgcqWznwLP9yeIcSxNTlFXkiC6PoxocwFjfLtEn0IF9BSjxMop4MM5de0POVjO5yAeEGQHKw$ >


Please remember to update the status online – DO NOT download the files.

The reports contain activities for May 2024 ~ October 2024. You can
filter for your CAM name in column D.

**** PLEASE NOTE THE FOLLOWING INSTRUCTIONS IN FILLING OUT YOUR STATUS
SHEETS: ****

  1. Please provide the status in columns L, M, N, O, and S. Make sure
     you provide the **Expected Finish** date (column O) for all
     *activities in progress*. This is important for us to re-calculate
     EAC, the float, and the critical path.
  2. The remaining units are calculated based on the original duration of
     the activity and the percent complete. Please provide **Units to
     Complete* in column S* for activities in progress. It is if you
     expect to use more or less labor for a specific task to be completed
     or the cost for material/travel is different than originally
     planned. Column T shows Total Cost per resource from P6. Columns U
     (Remaining Cost based on the remaining units from P6), V (Updated
     Remaining Cost, also called ETC or Estimate-to-Complete), W (EAC or
     Estimate at Complete, calculated based on updated units) and X
     (Delta EAC minus baseline cost) are formula fields that provide
     calculations on how the cost changes when the Remaining Units are
     adjusted.
  3. Make sure that you enter the actual start date for all started
     activities and finish date for all activities that are 100%
     completed. All *_NEW_* actual start and finish dates *MUST
     BE* within the current reporting period.
  4. Do *NOT *change the actual start dates if they are already in the
     spreadsheet – EVMS does not allow changing the past. If the actual
     start date was entered incorrectly in the previous month just leave
     it as it is.
  5. Do *NOT* enter dates after May 31, 2024,  in *actual* start/finish
     dates (columns M and N); this creates errors in P6.
  6. Do *NOT* decrease the percent complete in column L.
  7. Do *NOT* write any notes in the spreadsheet. If you want to add a
     comment use column Y.
  8. Do *NOT* change the formatting of the cell once you edit it.  The
     spreadsheet will automatically highlight the change in yellow.
*__*

*_Additional Note: _*

If progress was made on future activities that are not in the status
sheet you can contact your project controls specialist and ask for her
help with statussing the activities directly in P6.

Please complete the May Status updates by *_Tuesday, May 28^th _. *

We expect the L2 managers and deputies will notify Rosemarie, as soon as
the status of their system is complete.

Thank you,

Rosemarie

Rosemarie D. Smith

U.S. ATLAS HL-LHC Upgrade Project

Brookhaven National Laboratory
Physics Department, Bldg. 510

PO Box 5000

Upton, NY 11973 -5000
Office: 631.344.3743
rsmith2 AT bnl.gov <mailto:rsmith2 AT bnl.gov>

Twitter <https://urldefense.com/v3/__https://twitter.com/BrookhavenLab__;!!P4SdNyxKAPE!FTlmUxpcbp8fUAq8FcEzarpVsw9MhwFnUJrwcAMgcqWznwLP9yeIcSxNTlFXkiC6PoxocwFjfLtEn0IF9BSjxMop4MM5de0POVjO5yAnayvNmg$ > | Facebook
<https://urldefense.com/v3/__https://www.facebook.com/brookhavenlab__;!!P4SdNyxKAPE!FTlmUxpcbp8fUAq8FcEzarpVsw9MhwFnUJrwcAMgcqWznwLP9yeIcSxNTlFXkiC6PoxocwFjfLtEn0IF9BSjxMop4MM5de0POVjO5yCshUkcTg$ > | Instagram
<https://urldefense.com/v3/__https://www.instagram.com/brookhavenlab/__;!!P4SdNyxKAPE!FTlmUxpcbp8fUAq8FcEzarpVsw9MhwFnUJrwcAMgcqWznwLP9yeIcSxNTlFXkiC6PoxocwFjfLtEn0IF9BSjxMop4MM5de0POVjO5yBGtMA3KQ$ > | LinkedIn
<https://urldefense.com/v3/__https://www.linkedin.com/company/brookhavenlab/__;!!P4SdNyxKAPE!FTlmUxpcbp8fUAq8FcEzarpVsw9MhwFnUJrwcAMgcqWznwLP9yeIcSxNTlFXkiC6PoxocwFjfLtEn0IF9BSjxMop4MM5de0POVjO5yACUbovrA$ >




Archive powered by MHonArc 2.6.24.

Top of Page