Dear All,
I was wondering we have something which needs discussion today?
Thanks elke
On Aug 17, 2017, at 12:10, Bill Christie <christie AT bnl.gov> wrote:
Dear All,
Below please find the minutes from our meeting on August 4th.
Greetings,
Bill
Minutes from the eRHIC IR Design meeting held on August 4, 2017
---------------------------------------------------------------------------------------
Agenda:
- Bob's Presentation
- Update on effort to match IR to the rest of the Lattice
- Geometry Update
* Bob's Presentation:
- presents argument why for ring-ring design one expects (possible?) epsilon_y_e << epsilon_x_e
- makes point that with short, flat beams that one may be able to operate without crab cavities and lose only ~40% of the luminosity.
- brief discussion of whether it could be possible to operate without a crossing angle, difficult is one wants a small beta*.
- Bob explains the choices of divergences, essentially balancing luminosity vs acceptance and measurement errors.
- Elke emphasizes the point again that the possibility of running with small divergences in both directions (x & y) will be an important feature (choice #3 in Bob's list). Important for the p-e physics program.
- Elke makes the point that the divergence of the Au beam is important as well, as it ties into the neutron acceptance. As important as the proton divergence is in p-e.
- Bob presents slide defining three levels of cooling
- Conclusion on cooling discussion, it gets down to how one wants to present it
- Moderate cooling with CeC:
- If CeC works then all good
- If CeC doesn't work, assess different cooling techniques
End of Bob's presentation
* Matching IR to rest of Lattice Update
- One meeting has been held
- Homework was assigned and done
- Discussions at meeting
- Parameters to use (language)
- Which things to work on first
- An ongoing effort
* Geometry Update
- Bill had talked with Ferdi about desire to have the geometry for the IR put into a drawing
- Ferdi commented that too early to get designers involved, to involve them one needs precise numbers, inefficient at this point
- Idea to try and draw up preliminary geometry drawings with simpler software packages
- Suggestion to speck with Dejan about possibly getting Stephen involved in this
* Discussion of next meeting
- Schedule for two weeks from today (i.e. next mtg on August 18th at 2 pm)
- Cancel if deemed desirable
- Update on geometry
- update on the lattice matching effort.
End of Meeting
_______________________________________________
E-rhic-ir-l mailing list
E-rhic-ir-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/e-rhic-ir-l
( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
) `\ -
/ '. | +
| `, Elke-Caroline Aschenauer =
\,_ `-/ -
,&&&&&V Brookhaven National Lab +
,&&&&&&&&: Physics Dept., 25 Corona Road =
,&&&&&&&&&&; Bldg. 510 /2-195 Rocky Point, NY, -
| |&&&&&&&;\ 20 Pennsylvania Avenue 11778 +
| | :_) _ Upton, NY 11973 =
| | ;--' | Tel.: 001-631-344-4769 Tel.: 001-631-569-4290 -
'--' `-.--. | Cell: 001-757-256-5224 +
\_ | |---' =
`-._\__/ Mail: elke AT bnl.gov elke.caroline AT me.com -
=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
-
[E-rhic-ir-l] Minutes from the eRHIC IR Design mtg held on August 4, 2017.,
Bill Christie, 08/17/2017
-
[E-rhic-ir-l] Meeting today,
Aschenauer Elke-Caroline, 08/18/2017
-
Re: [E-rhic-ir-l] eRHIC IR Design Meeting today,
Bill Christie, 08/18/2017
- Re: [E-rhic-ir-l] eRHIC IR Design Meeting today CANCELED, Bill Christie, 08/18/2017
-
Re: [E-rhic-ir-l] eRHIC IR Design Meeting today,
Bill Christie, 08/18/2017
-
[E-rhic-ir-l] Meeting today,
Aschenauer Elke-Caroline, 08/18/2017
Archive powered by MHonArc 2.6.24.