Dear Brett, Christoph, Guillaume, and Steven
the only response we got is from Vadim that the attached table is the correct one.
But have not received any information which will allow us to do the simulations discussed below.
Time is getting shorter and shorter that anything will be possible to be done and included in the writeup.
elke
On Feb 20, 2018, at 06:58, Aschenauer Elke-Caroline <elke AT bnl.gov> wrote:Dear All,so here is the summary of what we need to make progress on the acceptance simulations, the synchrotron simulations and the impedance calculations.For both of the electron and the hadron beam we need the beam parameters, i.e. emittance, divergence, beta - functions and so on.It would be really good if this would be the parameters which are frozen for the pre-CDR.We got the following table from Vadim, is this the latest?
Attachment:
erhic_parameters_v5.1.xlsx
Description: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
Charles needs for his simulations and design the following info- the information on the ‘bucking’ coils for Q0Fe should be included in the table.- the beta functions at 5, 5.6, 6.2, 8.7, 10.5 and 15m from the IP on the hadron forward side for 5, 10 and 18 GeV rings.- the quad strengths (Q0Fe and Q1Fe) for the 5 and 10 GeV rings- shape of magnet aperture if not round- for the simulations we need the magnets for both the hadron and electron beams in a format as attached, any divergencefrom this will mean there are no simulations for the pre-CDR
## using Palmer's file is beta82cg
## For 'High Luminosity' parameters giving, with electron energy 10.1 GeV,
Lum = 2.86 10^33
## Plots and other parameters were distributed on 11/2/2017 in a file 1702-IR
Design-v2.pdf
##
## The design reflects Sergei's shift of B3 to the right by 9.4 m
## A new quad NQ was introduced to better control the betas at R3 and R4
##
## Warning:
## This design was simulated by a home made program and may not exactly agree
with
## madX and other codes
## The detector solenoid is not included
## ----------------------------------------------------------
## Initial conditions at IP
##
## beta*_x beta*_y g emit_x g emit_y angle_x angle_y
## [m] [m] [nm] [nm] [mrad] [mrad]
0.9440 0.0420 16.1000 6.1000 0 0
## -----------------------------------------------------------
## magnet parameters
##
##name center_z center_x center_y radius length angle B
gradient
## [m] [m] [m] [m] [m] [mrad] [T]
[T/m]
##
B0pf 5.099 -0.0132 0.00 0.1700 1.200 -22.00 -1.700 0.00
Q1pf 7.289 -0.0284 0.00 0.0370 1.981 -4.00 0.000 -91.54
B1pf 13.198 -0.0603 0.00 0.0890 4.800 2.80 3.516 0.00
Q2pf 17.457 -0.0012 0.00 0.1250 2.520 -2.00 0.000 28.41
Q3pf 37.192 0.3557 0.00 0.0500 1.200 16.20 0.000 0.89
B2pf 44.091 0.3247 0.00 0.0500 7.800 -1.80 -4.397 0.00
Q4pf 53.988 0.2567 0.00 0.0500 1.200 -22.00 0.000 28.96
B3pf 66.185 -0.1760 0.00 0.0500 8.800 -41.80 -4.400 0.00
NQpf 72.984 -0.4336 0.00 0.0600 1.200 -63.54 0.000 -52.52
Q5pf 88.380 -1.4088 0.00 0.0400 1.000 -63.47 0.000 55.00
H1pf 93.754 -1.8350 0.00 0.0500 8.750 -63.45 0.000 0.00
Q6pf 104.626 -2.4511 0.00 0.0400 2.000 -63.45 0.000 27.50
## x=0, z=0, y=0 is at the center of the IP
## The z axis is aligned with the inital mean hadron direction
## The apertures of B2 and B3 may be too large requiring changes in settings
## H1 is the spin rotator assumed not to focus or bend
## Q5 and Q6 are place holder for strengths to be set by matching
##
------------------------------------------------------------------------------
##
## parameters at the Roman Pots
##
##loc Z beta_x beta_y adv_x adv_y Disp
## [m] [m] [m] rad/pi rad/pi {m}
##
R1 31.00 1197.6 195.70 0.476 0.52 0.205
R2 35.00 1208.2 164.58 0.477 0.53 0.253
R3 83.55 12.5 12.27 0.597 0.79 -2.051
R4 86.40 4.4 5.54 0.722 0.90 -2.404
## Phase advance x in R3 should be kept to approx 0.6 and may need tweeking
## beta_y in R3 should be 12 m or more
##--------------------------------------------------------------------------------
## my next iteration will/may:
## lower beta_x at B2 and B3 to allow use of RHIC magnets
## require a new quad between Current Q1 nd B1 for the VHL case
## a lower beta_x at R3 and R4 to maintain acceptances
## This will presumably be for after the March review
We need the B0 dimensions to see we can install detectors of which dimensions and what numberand it would be good to have the info on the crab-cavities, like a function how the bunch is rotated or so.Cheers and thanks for providing the infoelke( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=) `\ -/ '. | +| `, Elke-Caroline Aschenauer =\,_ `-/ -,&&&&&V Brookhaven National Lab +,&&&&&&&&: Physics Dept., 25 Corona Road =,&&&&&&&&&&; Bldg. 510 /2-195 Rocky Point, NY, -| |&&&&&&&;\ 20 Pennsylvania Avenue 11778 +| | :_) _ Upton, NY 11973 =| | ;--' | Tel.: 001-631-344-4769 Tel.: 001-631-569-4290 -'--' `-.--. | Cell: 001-757-256-5224 +\_ | |---' =`-._\__/ Mail: elke AT bnl.gov elke.caroline AT me.com -=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
) `\ -
/ '. | +
| `, Elke-Caroline Aschenauer =
\,_ `-/ -
,&&&&&V Brookhaven National Lab +
,&&&&&&&&: Physics Dept., 25 Corona Road =
,&&&&&&&&&&; Bldg. 510 /2-195 Rocky Point, NY, -
| |&&&&&&&;\ 20 Pennsylvania Avenue 11778 +
| | :_) _ Upton, NY 11973 =
| | ;--' | Tel.: 001-631-344-4769 Tel.: 001-631-569-4290 -
'--' `-.--. | Cell: 001-757-256-5224 +
\_ | |---' =
`-._\__/ Mail: elke AT bnl.gov elke.caroline AT me.com -
=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
-
[E-rhic-ir-l] Fwd: our needs to make progress,
Aschenauer Elke-Caroline, 02/20/2018
-
Re: [E-rhic-ir-l] our needs to make progress,
Ptitsyn, Vadim, 02/22/2018
- Re: [E-rhic-ir-l] our needs to make progress, Aschenauer Elke-Caroline, 02/23/2018
-
Re: [E-rhic-ir-l] our needs to make progress,
Robert-Demolaize, Guillaume, 02/23/2018
- Re: [E-rhic-ir-l] our needs to make progress, Aschenauer Elke-Caroline, 02/23/2018
- Re: [E-rhic-ir-l] our needs to make progress, Aschenauer Elke-Caroline, 02/23/2018
-
Re: [E-rhic-ir-l] our needs to make progress,
Ptitsyn, Vadim, 02/22/2018
Archive powered by MHonArc 2.6.24.