[E-rhic-ir-l] Minutes from the eRHIC IR Design meeting held on May 25, 2018.
- From: Bill Christie <christie AT bnl.gov>
- To: <E-rhic-ir-l AT lists.bnl.gov>
- Subject: [E-rhic-ir-l] Minutes from the eRHIC IR Design meeting held on May 25, 2018.
- Date: Fri, 8 Jun 2018 12:40:28 -0400
Dear All,
Below please find the minutes from our eRHIC IR Design meeting that was held on Friday, 5/25/2018. Please note that our next meeting will be on Friday June 8, at 3 pm.
Greetings,
Bill
Minutes from the eRHIC IR Design meeting held on 5/25/18
---------------------------------------------------------------------------------
* We started with a brief discussion of the agenda for the meeting.
* Elke reminds the group that she and Alexander would like to have the parameter table for the High Acceptance configuration.
- Elke also indicated that Charles is working with Alexei on the vacuum design to reduce the impedance.
* pCDR Update: Elke
- Elke is pursuing some additional information from people.
- Elke asks about who contributed text to the IR section of the pCDR.
- Bob indicates that he will write a paragraph.
* We walked through Bob's Figures:Attached
- First plot shows the synchrotron fan
- Points out that at some point we might want to eliminate B1Er, and increase strength of B2Er.
- Elke makes the point that Q1Er and Q1Pr, separate in the Fig., show up as a single combined function magnet in the Table. Need to update the table to reflect the Fig.
- Second Fig. Bob would like to get and include details about the luminosity monitor.
- Third Fig., Bob points out that it reflects a hole in the neutron detector for the outgoing hadron beam.
- Elke points out that for the Roman pots that are now planned to be used they will just be vertical pots.
- High divergence beam envelope shown on the fig.
- Fourth Fig., Has included the RHIC magnets
- Shows how close the crab cavity gets to the hadron magnet cryostat.
* Next Qiong walks us through the model figures provided by Doug:Attached.
- One Crab Cavity (CC) consists of two cryostats
- 2 cavities/cryostat
- All 4 cavities would always be in use simultaneously.
- Update on CERN CC testing, Wednesday (May 23rd) @ 1pm, the CERN CC saw the first evidence of crabbing of the beams!
* We discuss Doug's IR region plot.
* Alexei points out that he is working with Charles. There is a modified vacuum design for Alexei to use in his simulations.
* Kyle gives a presentation on the repository software/system
- Kyle will send out a link to the site
- Elke points out that we should use the "OPA source" version of GIT that the Software group uses.
- Kyle gives a real time demo of GIT.
- Brief discussion about where this GIT repository should sit.
- Should be on a BNL supported server.
* Next meeting two weeks from today (i.e. on June 8th) at 3 pm.
Draft Agenda:
- Update on impedance by Alexei
- Update on Simulations
- pCDR changes and/or needs by Elke
- AOB
End of the meeting.
Attachment:
Crab Cavity and Cryomodule Concept Design and Analysis 2017-12-01.pdf
Description: Adobe PDF document
Attachment:
yypea1k_RP_5_25_1.png
Description: PNG image
Attachment:
yyepr2kk_RP_2_25_2.png
Description: PNG image
Attachment:
yypef02k_RP_5_25_3.png
Description: PNG image
Attachment:
yyepa3k_RP_5_25_4.png
Description: PNG image
- [E-rhic-ir-l] Minutes from the eRHIC IR Design meeting held on May 25, 2018., Bill Christie, 06/08/2018
Archive powered by MHonArc 2.6.24.