e-rhic-ir-l AT lists.bnl.gov
Subject: E-rhic-ir-l mailing list
List archive
[E-rhic-ir-l] Minutes from the eRHIC IR Design meeting held on September 7, 2018.
- From: Aschenauer Elke-Caroline <elke AT bnl.gov>
- To: "List (E-rhic-ir-l AT lists.bnl.gov)" <E-rhic-ir-l AT lists.bnl.gov>
- Subject: [E-rhic-ir-l] Minutes from the eRHIC IR Design meeting held on September 7, 2018.
- Date: Tue, 11 Sep 2018 23:04:18 -0400
Dear All,
these are the minutes of our Ir Meeting on September 7.
A always please add or correct the statements below.
Cheers elke
We had a relative short meeting. We first discussed about the current situation
- Doug and Stephen T. have found a way to fit all in the tunnel, this means we have the following situation
- 25mrad crossing angle
- rotate the IR
- move the IP 1m towards the ring inside
Bob asked if a bigger chicane in the outgoing electron beam would help
—> answer yes, for the acceptance of the low Q2 tagger
we also discussed that maybe the new layout will allow to have more space between the Roman Pots and the ZDC, which is something physics would benefit from.
It was reiterated that for physics it is really a disadvantage to have the IR magnets inside the detector volume.
Holger gave a presentation about the Q1APF, see attachment.
Agenda items for the next meeting:
- update by Bob
- Stephen T. and Doug should give an update on their efforts to fir everything in to the tunnel and the consequences on the magnets in the IR
- AoB
Attachment:
2018-09-07_Q1APF.pdf
Description: Adobe PDF document
( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
) `\ -
/ '. | +
| `, Elke-Caroline Aschenauer =
\,_ `-/ -
,&&&&&V Brookhaven National Lab +
,&&&&&&&&: Physics Dept., 25 Corona Road =
,&&&&&&&&&&; Bldg. 510 /2-195 Rocky Point, NY, -
| |&&&&&&&;\ 20 Pennsylvania Avenue 11778 +
| | :_) _ Upton, NY 11973 =
| | ;--' | Tel.: 001-631-344-4769 Tel.: 001-631-569-4290 -
'--' `-.--. | Cell: 001-757-256-5224 +
\_ | |---' =
`-._\__/ Mail: elke AT bnl.gov elke.caroline AT me.com -
=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
-
[E-rhic-ir-l] Minutes from the eRHIC IR Design meeting held on September 7, 2018.,
Aschenauer Elke-Caroline, 09/11/2018
-
[E-rhic-ir-l] eRHIC IR Design meeting today at 2:30 pm.,
Christie, William, 09/21/2018
-
Re: [E-rhic-ir-l] eRHIC IR Design meeting today at 2:30 pm.,
Aschenauer Elke-Caroline, 09/21/2018
-
Re: [E-rhic-ir-l] eRHIC IR Design meeting today at 2:30 pm.,
Montag, Christoph, 09/21/2018
-
Re: [E-rhic-ir-l] eRHIC IR Design meeting today at 2:30 pm.,
Aschenauer Elke-Caroline, 09/21/2018
-
Re: [E-rhic-ir-l] eRHIC IR Design meeting today at 2:30 pm.,
Christie, William, 09/21/2018
- Re: [E-rhic-ir-l] eRHIC IR Design meeting today at 2:30 pm., Parker, Brett, 09/21/2018
-
Message not available
-
Re: [E-rhic-ir-l] eRHIC IR Design meeting today at 2:30 pm.,
Alexander Kiselev, 09/21/2018
- Re: [E-rhic-ir-l] eRHIC IR Design meeting today at 2:30 pm., Witte, Holger, 09/21/2018
-
Re: [E-rhic-ir-l] eRHIC IR Design meeting today at 2:30 pm.,
Alexander Kiselev, 09/21/2018
-
Re: [E-rhic-ir-l] eRHIC IR Design meeting today at 2:30 pm.,
Christie, William, 09/21/2018
-
Re: [E-rhic-ir-l] eRHIC IR Design meeting today at 2:30 pm.,
Aschenauer Elke-Caroline, 09/21/2018
-
Re: [E-rhic-ir-l] eRHIC IR Design meeting today at 2:30 pm.,
Montag, Christoph, 09/21/2018
-
Re: [E-rhic-ir-l] eRHIC IR Design meeting today at 2:30 pm.,
Aschenauer Elke-Caroline, 09/21/2018
-
[E-rhic-ir-l] eRHIC IR Design meeting today at 2:30 pm.,
Christie, William, 09/21/2018
Archive powered by MHonArc 2.6.24.