Skip to Content.
Sympa Menu

e-rhic-ir-l - Re: [E-rhic-ir-l] IR slides for thisafternoon

e-rhic-ir-l AT lists.bnl.gov

Subject: E-rhic-ir-l mailing list

List archive

Chronological Thread  
  • From: "Palmer, Robert" <palmer AT bnl.gov>
  • To: "Christie, William" <christie AT bnl.gov>, "E-rhic-ir-l AT lists.bnl.gov" <E-rhic-ir-l AT lists.bnl.gov>
  • Subject: Re: [E-rhic-ir-l] IR slides for thisafternoon
  • Date: Fri, 22 Mar 2019 15:54:35 +0000

Talk this afternoon on "Q2pF and B1pF, and other IR problems" with steps to
fix them, including parameters for:
Version 5A (the cost review parameters)
Version 6.2 (Q2pF & B1pF improvement, extended forward spectrometer
detector, and Low energy orbit correction}
Version 6.3 (with now easier split B1pF, easier Q2pF, and better p n
separation at Roman pots)

Bob

Attachment: 190322-IR8.pdf
Description: 190322-IR8.pdf



  • Re: [E-rhic-ir-l] IR slides for thisafternoon, Palmer, Robert, 03/22/2019

Archive powered by MHonArc 2.6.24.

Top of Page