Skip to Content.
Sympa Menu

ecce-eic-public-l - Re: [Ecce-eic-public-l] [Ecce-eic-det-l] Next ECCE tracking meeting at 10AM EST on June 18

ecce-eic-public-l AT lists.bnl.gov

Subject: ECCE Public Announcements

List archive

Chronological Thread  
  • From: "Lajoie, John G [PHYSA]" <lajoie AT iastate.edu>
  • To: "Li, Xuan" <xuanli AT lanl.gov>, "ecce-eic-public-l AT lists.bnl.gov" <ecce-eic-public-l AT lists.bnl.gov>, "ecce-eic-ib-l AT lists.bnl.gov" <ecce-eic-ib-l AT lists.bnl.gov>
  • Subject: Re: [Ecce-eic-public-l] [Ecce-eic-det-l] Next ECCE tracking meeting at 10AM EST on June 18
  • Date: Sun, 20 Jun 2021 17:26:39 +0000

Hi Xuan,

 

Many thanks for sending out this summary. I apologize for missing the meeting on Friday, I was caught in an sPHENIX collaboration meeting discussion.

 

I was looking through the slides, especially Leo Greiner’s very nice slides on the supports and services required or modern Si detectors. At the end he suggests various levels of approximation for simulating the material budget for the supports and services in the absence of a complete design. I’m curious if these was discussion of this within the working group, and what is currently implemented in the simulations? In ECCE are we using what is already implemented in the all-Si tracker model, which I think is a homogenous model of the services and supports?

 

John

 

From: Ecce-eic-det-l <ecce-eic-det-l-bounces AT lists.bnl.gov> On Behalf Of Li, Xuan via Ecce-eic-det-l
Sent: Friday, June 18, 2021 5:25 PM
To: ecce-eic-public-l AT lists.bnl.gov; ecce-eic-det-l AT lists.bnl.gov; ecce-eic-ib-l AT lists.bnl.gov
Subject: Re: [Ecce-eic-det-l] Next ECCE tracking meeting at 10AM EST on June 18

 

Hi All,

        The minutes for today's ECCE tracking meeting has been posted to the indico and the summary is the following:

 

1,  silicon detector services and support estimates by Leo Greiner (LBNL):

 

Nice summary of detailed service layout and support estimated has been provided by Leo's presentation. Broad discussions on the all-silicon tracker geometry implemented with the preliminary service layout and support.

 

Suggest to check the different service layout in the simulation and explore the impacts.

 

2,  EIC background studies by Jin Huang (BNL):

 

Nice summary of the beam gas and synchrotron radiation background studies with Be beam pipe and 2 micron Au coating Be beam pipe. A order of 3 magnitude reduction on synchrotron radiation with the 2 micron Au coating Be beam pipe. Look forward to see the final design to be implemented in simulation and check the impacts on the tracking performance.

 

        Thanks.

                                                                                Xuan


From: Li, Xuan
Sent: Wednesday, June 16, 2021 9:19:33 AM
To: ecce-eic-public-l AT lists.bnl.gov; ecce-eic-det-l AT lists.bnl.gov; ecce-eic-ib-l AT lists.bnl.gov
Subject: Next ECCE tracking meeting at 10AM EST on June 18

 

Dear All,

         We will have the next ECCE tracking meeting at 10AM EST on June 18. Please see the agenda below:

 

                  https://indico.bnl.gov/event/11660/

         

         We have two talks scheduled:

 

               Silicon detector services and support estimates by  Leo Greiner (LBNL)



               EIC background studies by Jin Huang (BNL)

             

 

         If you would like to give a presentation in this meeting, please let us know.

         Talk to you this Friday.

 

                                                                                                   Nilanga and Xuan




Archive powered by MHonArc 2.6.24.

Top of Page