ecce-eic-public-l AT lists.bnl.gov
Subject: ECCE Public Announcements
List archive
Re: [Ecce-eic-public-l] [EXTERNAL] Next ECCE tracking meeting at 3:00PM EST on Sep. 13
- From: "Li, Xuan" <xuanli AT lanl.gov>
- To: "ecce-eic-ib-l AT lists.bnl.gov" <ecce-eic-ib-l AT lists.bnl.gov>, "ecce-eic-det-l AT lists.bnl.gov" <ecce-eic-det-l AT lists.bnl.gov>, "ecce-eic-public-l AT lists.bnl.gov" <ecce-eic-public-l AT lists.bnl.gov>
- Subject: Re: [Ecce-eic-public-l] [EXTERNAL] Next ECCE tracking meeting at 3:00PM EST on Sep. 13
- Date: Tue, 14 Sep 2021 22:44:15 +0000
Dear All,
Please see the minutes for today's ECCE tracking meeting below:
1, tracking performance with the 2nd simulation production by Xuan (LANL):
Xuan evaluated the tracking momentum and DCA_2D resolutions using single pion events with the the 2nd simulation production (general tracking). Tracking momentum resolution is improved in the forward rapidity region but is slightly higher in the central region compared to the 1st simulation production. The tracking DCA_2D resolution is slightly worse in the high pT region than the 1st simulation production.
Will work on the direct comparison in the tracking performance between the 1st and 2nd simulation production. Suggested to compare the general tracking and silicon/inner tracking configuration as well.
2, silicon tracker support structure design in CAD by Jim (JLab):
Jim Fast (JLab), Leo Greiner (LBNL) and Walter Sondheim (LANL) have worked together on the silicon tracker support structure for general EIC application. The first documents have been posted to https://userweb.jlab.org/~jfast/EIC/V0.
Jim presented the latest geometry details in CAD and will help the ECCE tracking system support structure design.
If I miss something, please feel free to add.
Thanks.
Xuan
Sent: Tuesday, September 14, 2021 12:12:43 PM
To: ecce-eic-ib-l AT lists.bnl.gov; ecce-eic-det-l AT lists.bnl.gov; Li, Xuan
Subject: Re: [EXTERNAL] [Ecce-eic-public-l] Next ECCE tracking meeting at 3:00PM EST on Sep. 13
Dear All,
This is a reminder that we will have the ECCE tracking meeting in less than 1 hour. I will report the first look of the tracking performance with the 2nd simulation production.
Please see the meeting details below.
Thanks.
Xuan
Sent: Monday, September 13, 2021 8:50:50 PM
To: ecce-eic-ib-l AT lists.bnl.gov; ecce-eic-det-l AT lists.bnl.gov; ecce-eic-public-l AT lists.bnl.gov
Subject: [EXTERNAL] [Ecce-eic-public-l] Next ECCE tracking meeting at 3:00PM EST on Sep. 13
Dear All,
We will have the next ECCE tracking meeting at 3:00PM EST on Sep. 13.
As we just have the second simulation production. We would like to share the status and gather inputs for the updated tracking geometry and performance. Meanwhile we welcome any updates/progresses about the ECCE tracking studies.
US (San Jose)
Dial by your location
+1 669 254 5252 US (San Jose)
+1 669 216 1590 US (San Jose)
+1 646 828 7666 US (New York)
+1 551 285 1373 US
Meeting ID: 161 872 4619
Passcode: 212461
Find your local number: https://bnl.zoomgov.com/u/anZ4422bq
-
[Ecce-eic-public-l] Next ECCE tracking meeting at 3:00PM EST on Sep. 13,
Li, Xuan, 09/13/2021
-
Message not available
- Re: [Ecce-eic-public-l] [EXTERNAL] Next ECCE tracking meeting at 3:00PM EST on Sep. 13, Li, Xuan, 09/14/2021
-
Message not available
Archive powered by MHonArc 2.6.24.