Skip to Content.
Sympa Menu

sphenix-calibration-l - Re: [Sphenix-calibration-l] Presentation at General Meeting this Friday

sphenix-calibration-l AT lists.bnl.gov

Subject: Sphenix-calibration-l mailing list

List archive

Chronological Thread  
  • From: Ross Corliss <rcorliss AT mit.edu>
  • To: "christof.roland AT cern.ch" <Christof.Roland AT cern.ch>
  • Cc: sphenix calibrations <sphenix-calibration-l AT lists.bnl.gov>
  • Subject: Re: [Sphenix-calibration-l] Presentation at General Meeting this Friday
  • Date: Fri, 12 Nov 2021 00:27:09 +0000

Dear Christof,

I would say (though the wording is just a suggestion)
 finalizing small number of improvements to the TPC geant model
 increased interaction between tracking and TPC calibrations as we work to implement the details of the multi-pass correction and tracking
 long standing padrow drift velocity bias now understood (this is Hugo's recent study)
 improved digitization model in progress, including baseline shift effects


I am probably overlooking other advances since the last time we updated.  It would probably be useful to show one of the recent workflow block diagrams -- probably one without all the intervening bubbles.  As before: the pieces all exist, we have a limited workforce, but are working to assemble these stand-alone pieces into the tracking/Fun4All framework.

Regards,

-Ross
 
On Nov 11, 2021, at 11:57 AM, Christof Roland via sPHENIX-calibration-l <sphenix-calibration-l AT lists.bnl.gov> wrote:

Hi Everybody, 

so far we have not gotten a lot of feedback yet. 
I updated sa minimal set of introductory slides. Please have a look and 
let us know what should follow as a concrete status update of the 
individual project groups. 

See here: 

Thanks

   Takao + Christof 

On 10. Nov 2021, at 18:13, Christof Roland via sPHENIX-calibration-l <sphenix-calibration-l AT lists.bnl.gov> wrote:

Hi Everybody,

we just received a request to present the progress of the calibration effort
at the general meeting this Friday. Its a bit late to schedule a meeting to
get ourselves organized, so i assume we should coordinate this by email.
Could all of you send us a few lines or bullet points of the topics to present
and later prepare a few slides we can put together into a presentation. If you
would rather present yourself let us know as well.

The MDC2 preparation will also be discussed in the GM so we should try
to keep the slides on general calibration preparations and MDC2 related
work separate if possible.

Cheers

  Takao & Christof
_______________________________________________
sPHENIX-calibration-l mailing list
sPHENIX-calibration-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-calibration-l

_______________________________________________
sPHENIX-calibration-l mailing list
sPHENIX-calibration-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-calibration-l




Archive powered by MHonArc 2.6.24.

Top of Page