Skip to Content.
Sympa Menu

sphenix-electronics-l - [Sphenix-electronics-l] EMCal Sector 0 Production Electronics Design Review, 18-April-0218 @ 1000 EDT

sphenix-electronics-l AT lists.bnl.gov

Subject: sPHENIX discussion of electronics

List archive

Chronological Thread  
  • From: eric mannel <mannel AT bnl.gov>
  • To: sphenix-electronics-l AT lists.bnl.gov, "sphenix-emcal-l AT lists.bnl.gov" <sphenix-emcal-l AT lists.bnl.gov>
  • Subject: [Sphenix-electronics-l] EMCal Sector 0 Production Electronics Design Review, 18-April-0218 @ 1000 EDT
  • Date: Mon, 16 Apr 2018 14:35:20 -0400


There will be a preproduction design review of the EMCal sector 0 electronics review this coming Wednesday at 10:00am EDT.  Meeting coordinates can be found on the agenda page: https://indico.bnl.gov/event/4548/manage/timetable/#20180418. For those at BNL, we will meet in 2-219.

This review will cover all aspects of EMCal Sector 0 electronics (Electrical/Cooling/Mechanical) in preparation for procurement of the electronics for EMCal Sector 0.

Eric

--
Eric J. Mannel, Ph.D.
PHENIX Group
Physics Dept.
Brookhaven National Laboratory
631/344-7626 (Office)
914/659-3235 (Cell)





Archive powered by MHonArc 2.6.24.

Top of Page