sphenix-electronics-l AT lists.bnl.gov
Subject: sPHENIX discussion of electronics
List archive
Re: [Sphenix-electronics-l] EMCal Sector 0 Production Electronics Design Review, 18-April-0218 @ 1000 EDT
- From: "Lynch, Don" <dlynch AT bnl.gov>
- To: "Mannel, Eric" <mannel AT bnl.gov>, "sphenix-electronics-l AT lists.bnl.gov" <sphenix-electronics-l AT lists.bnl.gov>, "sphenix-emcal-l AT lists.bnl.gov" <sphenix-emcal-l AT lists.bnl.gov>
- Subject: Re: [Sphenix-electronics-l] EMCal Sector 0 Production Electronics Design Review, 18-April-0218 @ 1000 EDT
- Date: Mon, 16 Apr 2018 20:51:57 +0000
Hi Eric,
Who is on the committee?
-Don
On 4/16/18, 2:35 PM, "sPHENIX-electronics-l on behalf of eric mannel"
<sphenix-electronics-l-bounces AT lists.bnl.gov on behalf of mannel AT bnl.gov>
wrote:
>
>There will be a preproduction design review of the EMCal sector 0
>electronics review this coming Wednesday at 10:00am EDT. Meeting
>coordinates can be found on the agenda page:
>https://indico.bnl.gov/event/4548/manage/timetable/#20180418. For those
>at BNL, we will meet in 2-219.
>
>This review will cover all aspects of EMCal Sector 0 electronics
>(Electrical/Cooling/Mechanical) in preparation for procurement of the
>electronics for EMCal Sector 0.
>
>Eric
>
>--
>Eric J. Mannel, Ph.D.
>PHENIX Group
>Physics Dept.
>Brookhaven National Laboratory
>631/344-7626 (Office)
>914/659-3235 (Cell)
>
>_______________________________________________
>sPHENIX-electronics-l mailing list
>sPHENIX-electronics-l AT lists.bnl.gov
>https://lists.bnl.gov/mailman/listinfo/sphenix-electronics-l
-
[Sphenix-electronics-l] EMCal Sector 0 Production Electronics Design Review, 18-April-0218 @ 1000 EDT,
eric mannel, 04/16/2018
- Re: [Sphenix-electronics-l] EMCal Sector 0 Production Electronics Design Review, 18-April-0218 @ 1000 EDT, Lynch, Don, 04/16/2018
Archive powered by MHonArc 2.6.24.