Skip to Content.
Sympa Menu

sphenix-emcal-l - Re: [Sphenix-emcal-l] [Sphenix-hcal-l] Calorimeter beam test

sphenix-emcal-l AT lists.bnl.gov

Subject: sPHENIX EMCal discussion

List archive

Chronological Thread  
  • From: Edward Kistenev <kistenev AT bnl.gov>
  • To: John Haggerty <haggerty AT bnl.gov>
  • Cc: "sphenix-emcal-l AT lists.bnl.gov" <sphenix-emcal-l AT lists.bnl.gov>, "sphenix-hcal-l AT lists.bnl.gov" <sphenix-hcal-l AT lists.bnl.gov>
  • Subject: Re: [Sphenix-emcal-l] [Sphenix-hcal-l] Calorimeter beam test
  • Date: Thu, 17 Dec 2015 15:34:58 -0300

John, sorry for missing meeting - we are completing local setup to get rid of pickup - hope hot sport at fiber exits will disappear too. I attach few pictures from UNIPLAST - they do now have grooving equipment of their own and learned how to groove inclining groves. We now may have fibers positioned to exactly our needs (prefable obviously be right-left symmetric).  The cut-off for bulk light suppression plug can be done while cutting the tile or at a time of grooving. I am not sure what is preferable.  

I also looked through your slides - one comment:
- When calorimeter is tilted the virtual collision vertex may move (or may not is Richie took care of it location) along the beam line. To be perfect - we would like to have silicon at exactly the location of that virtual collision point. I was asking Richie to work it out and provide the table so we will be able to adjust silicon position depending on tillt angle (if needed).

Do we have cosmic data for large production tiles. What’s the current judgement on light yield difference small-large. 

Edward 
unknown.jpg



unknown.jpg



Edward Kistenev, PhD



PHENIX Physicist





On Dec 17, 2015, at 12:02 PM, John Haggerty <haggerty AT bnl.gov> wrote:

We just had two days of discussion which focused on the calorimeter beam
test, so let's have a minimal beam test prep meeting today:

https://indico.bnl.gov/conferenceDisplay.py?confId=1633

The Blue Jeans information is on the Indico page, and the meeting is in
2-219.

--
John Haggerty
email: haggerty AT bnl.gov
cell: 631 741 3358
_______________________________________________
Sphenix-hcal-l mailing list
Sphenix-hcal-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-hcal-l




Archive powered by MHonArc 2.6.24.

Top of Page