sphenix-emcal-l AT lists.bnl.gov
Subject: sPHENIX EMCal discussion
List archive
Re: [Sphenix-emcal-l] [Sphenix-hcal-l] Calorimeter beam test meeting today
- From: "Boose, Stephen" <boose AT bnl.gov>
- To: "Kistenev, Edouard" <kistenev AT bnl.gov>, "Haggerty, John" <haggerty AT bnl.gov>
- Cc: "sphenix-emcal-l AT lists.bnl.gov" <sphenix-emcal-l AT lists.bnl.gov>, "sphenix-hcal-l AT lists.bnl.gov" <sphenix-hcal-l AT lists.bnl.gov>
- Subject: Re: [Sphenix-emcal-l] [Sphenix-hcal-l] Calorimeter beam test meeting today
- Date: Thu, 14 Jan 2016 16:44:54 +0000
Hi Edward, The decree was kind of a joke but the point was that I will no longer be building convoluted reset systems for devices such as the Rasperry Pi just because they contain neither a watchdog or “dead man” timer. The control devices that we are using are the type found in military, medical equipment and automobile engines. That’s why your car doesn’t just shut off in the middle of the Long Island Expressway.
Steve Boose PHENIX Experiment Brookhaven National Laboratory BLDG 510C Upton, NY 11973 Ph: (631) 344-2897 Fx: (631) 344-3253
From: sphenix-hcal-l-bounces AT lists.bnl.gov [mailto:sphenix-hcal-l-bounces AT lists.bnl.gov]
On Behalf Of Edward Kistenev
Who wrote that decree …. why it is about “not to contain” only, without blue/ras - berries it looks like instruction on “how to create void” … Otherwise - my summary is trivial: we have an excellent scintillating tiles and we still have a chance to install blends. With proper SiPM selection and dual gain preamps we may have all channels perfectly equalized (there will be only one common to everyone energy scale missing) and ready for the beam even before the cosmic calibration in high bay … But we should still try to do it and test my claim.
Edward
On Jan 14, 2016, at 11:47 AM, John Haggerty <haggerty AT bnl.gov> wrote:
Many people are away today, but we'll have a short test beam meeting
https://indico.bnl.gov/conferenceDisplay.py?confId=1696
|
-
[Sphenix-emcal-l] Calorimeter beam test meeting today,
John Haggerty, 01/14/2016
-
Re: [Sphenix-emcal-l] Calorimeter beam test meeting today,
Edward Kistenev, 01/14/2016
- Re: [Sphenix-emcal-l] Calorimeter beam test meeting today, Edward Kistenev, 01/14/2016
-
Re: [Sphenix-emcal-l] [Sphenix-hcal-l] Calorimeter beam test meeting today,
Boose, Stephen, 01/14/2016
- Re: [Sphenix-emcal-l] [Sphenix-hcal-l] Calorimeter beam test meeting today, Edward Kistenev, 01/14/2016
-
Re: [Sphenix-emcal-l] Calorimeter beam test meeting today,
Edward Kistenev, 01/14/2016
Archive powered by MHonArc 2.6.24.