sphenix-emcal-l AT lists.bnl.gov
Subject: sPHENIX EMCal discussion
List archive
- From: eric mannel <mannel AT bnl.gov>
- To: "sphenix-emcal-l AT lists.bnl.gov" <sphenix-emcal-l AT lists.bnl.gov>
- Subject: [Sphenix-emcal-l] EMCal V3 back up in HCal lab
- Date: Thu, 27 Jul 2017 12:02:15 -0400
With the help of Rob, his 2 summer students and Steve, the V3
EMCal is back up and running. Modifications include:
I have successfully taken one short run with the LED pulsing.
Plot attached of signal in 16 channels Eric -- Eric J. Mannel, Ph.D. PHENIX Group Physics Dept. Brookhaven National Laboratory 631/344-7626 (Office) 914/659-3235 (Cell) |
Attachment:
2017-07-24 14.29.20.jpg
Description: JPEG image
Attachment:
2017-07-24 14.29.07.jpg
Description: JPEG image
Attachment:
emcal_pulse-27Jul17.png
Description: PNG image
- [Sphenix-emcal-l] EMCal V3 back up in HCal lab, eric mannel, 07/27/2017
Archive powered by MHonArc 2.6.24.