Eric, Considering the already tight schedule and the min-safe status, If funding is available then proceed with the order. Time is not on our side ! (My opinion). Hope all is well with everyone. Regards, Mike
On 2020-03-25 13:07, eric mannel wrote:
EMCal Assembly Experts-
There is a rather long lead time to get the interior signal cables
(silver flat cable) components procured and assembled. Is there any
reason we should not go forward with the balance of the order for
sectors 13-64? Technically we were suppose to wait for a design
review after Sector 1 was complete, but with the current situation,
that may no longer feasible. I do have a quote for the balance, and
am ready to submit the requisition if we think the design is final.
Eric
-
[Sphenix-emcal-l] EMCal Interior Signal Cabless,
eric mannel, 03/25/2020
- Re: [Sphenix-emcal-l] EMCal Interior Signal Cabless, mlenz, 03/25/2020
- Re: [Sphenix-emcal-l] EMCal Interior Signal Cabless, Edward O'Brien, 03/25/2020
Archive powered by MHonArc 2.6.24.