sphenix-hcal-l AT lists.bnl.gov
Subject: sPHENIX HCal discussion
List archive
- From: EdwardOBrien <eobrien AT bnl.gov>
- To: Edward Kistenev <kistenev AT bnl.gov>, Megan Connors <megan.connors AT yale.edu>, sphenix-hcal-l AT lists.bnl.gov
- Subject: Re: [Sphenix-hcal-l] Tiles
- Date: Wed, 13 Jan 2016 12:29:36 -0500
Hi Edward,
Could you provide more detail about this comment in your
e-mail? I don't understand your point. Thanks.
Ed
On 1/12/2016 1:35 PM, Edward Kistenev wrote:
Finally - I am very worried by discussion about what is below the SiPM
coupler. I wrote so many mails about the need to have the bulk light
suppression blend between tile and SiPM but it looks as if all of it was
totally ignored. If it is not done - out Inner section may become a
tail-generator (not easy to simulate), it is less important in the Outer
HCal where fiber-SiPM coupling area is far from the shower maximum.
-
[Sphenix-hcal-l] Tiles,
Edward Kistenev, 01/12/2016
-
Re: [Sphenix-hcal-l] Tiles,
EdwardOBrien, 01/13/2016
-
Re: [Sphenix-hcal-l] Tiles,
Edward Kistenev, 01/13/2016
-
Re: [Sphenix-hcal-l] Tiles,
John Lajoie, 01/13/2016
- Re: [Sphenix-hcal-l] Tiles, Edward Kistenev, 01/13/2016
-
Re: [Sphenix-hcal-l] Tiles,
John Lajoie, 01/13/2016
-
Re: [Sphenix-hcal-l] Tiles,
Edward Kistenev, 01/13/2016
-
Re: [Sphenix-hcal-l] Tiles,
EdwardOBrien, 01/13/2016
Archive powered by MHonArc 2.6.24.