Skip to Content.
Sympa Menu

sphenix-hcal-l - [Sphenix-hcal-l] Prototype3

sphenix-hcal-l AT lists.bnl.gov

Subject: sPHENIX HCal discussion

List archive

Chronological Thread  
  • From: John Haggerty <haggerty AT bnl.gov>
  • To: "sphenix-hcal-l AT lists.bnl.gov" <sphenix-hcal-l AT lists.bnl.gov>
  • Subject: [Sphenix-hcal-l] Prototype3
  • Date: Mon, 21 Nov 2016 23:32:19 -0500

Hello HCAL,

I put some documentation for HCAL prototype3 here:

T1044-2017-0 spreadsheet:
https://docdb.sphenix.bnl.gov/cgi-bin/private/ShowDocument?docid=34

HCAL tile drawings:
https://docdb.sphenix.bnl.gov/cgi-bin/private/ShowDocument?docid=35

and Edward, Frank, Sal, Steve, and I have assembled one "column" of the IHCAL. Run 3026 at RCF has paddle-triggered cosmics from the weekend for those 4 towers (20 tiles). There are some anomalies to investigate, but that will be easier when we have all the LED fibers connected.

Also, Edward received the large tiles today with much help from Mike Lenz, so we now have all the raw material for the next beam test.

Also, I moved the old testbeam.db to testbeam.db.run16 and corrected some errors in it, and we're now writing a new version of testbeam.db.

--
John Haggerty
email: haggerty AT bnl.gov
cell: 631 741 3358



  • [Sphenix-hcal-l] Prototype3, John Haggerty, 11/21/2016

Archive powered by MHonArc 2.6.24.

Top of Page