Skip to Content.
Sympa Menu

sphenix-hcal-l - [Sphenix-hcal-l] summary from production readiness meeting at Uniplast

sphenix-hcal-l AT lists.bnl.gov

Subject: sPHENIX HCal discussion

List archive

Chronological Thread  
  • From: "Lajoie, John G [PHYSA]" <lajoie AT iastate.edu>
  • To: "sphenix-hcal-l AT lists.bnl.gov" <sphenix-hcal-l AT lists.bnl.gov>
  • Subject: [Sphenix-hcal-l] summary from production readiness meeting at Uniplast
  • Date: Thu, 13 Jun 2019 15:43:31 +0000

Dear HCAL’ers:

 

Xiaochun, Anthony, Edward toured Uniplast Wednesday and met with Victor Majatski to discuss the results from the pre-production and action items for the full HCAL tile production.  The notes from this meeting are attached for reference.

 

Something not listed in the notes is that for the pre-production tile B25 was manufactured to an older design, before the light guide was moved to accommodate the combs in the outer HCAL.  This happened because an operator was on vacation when the production switch was made to B25, and the wrong file was loaded into the CnC machine. Uniplast recognizes this mistake and will replace the B25 tiles – they have sufficient spare materials on hand to start immediately and expect to have the replacement tiles completed in two weeks. Ideally we will still get them in July for the sector assembly, and I have spoken with Anthony about fast-tracking testing.  We have reviewed the rest of the tile designs and they are OK; Megan plans a test fit of a complete set in an oHCAL gap soon to verify.

 

Nobody wants things like to happen, but they do. If everything seemed perfect I would worry what we missed….

 

Regards,

John


John Lajoie

Professor of Physics

Iowa State University

 

(515) 294-6952

lajoie AT iastate.edu

 

Attachment: Summary of HCAL Scintillating Tile Production Readiness Meeting.pdf
Description: Summary of HCAL Scintillating Tile Production Readiness Meeting.pdf




Archive powered by MHonArc 2.6.24.

Top of Page