sphenix-hcal-l AT lists.bnl.gov
Subject: sPHENIX HCal discussion
List archive
[Sphenix-hcal-l] Current Testing & Calibration Run List
- From: Daniel Richford <daniel.richford AT gmail.com>
- To: sphenix-hcal-l AT lists.bnl.gov
- Subject: [Sphenix-hcal-l] Current Testing & Calibration Run List
- Date: Wed, 2 Jun 2021 12:13:02 -0400
For all those people working on calibration and data-analysis of testing data, here is a preliminary list of runs to look at.
Assembly-phase: Currently, only cosmics data (differences from nominal VOP noted as necessary). I am going through various logs and lists to find the assembly-phase test data, which has already long been looked at.
Pre-Burn-In phase: Tests & cosmics (nominal Vop was used for all sectors) (only the bottom half of the sectors have runs, here).
Post-burn-in phase: Only a few sectors have made it here.
Future updates: Will add list for special runs (first rotation test, variable voltage cosmics, variable voltage led, 200min-cosmics, low-gain runs, etc. And, we'll update the list as new data comes up!
You can view the database here: https://docs.google.com/spreadsheets/d/1rIUAVjWNd7wE9ms2BfCqUAGH0KbNNxG7OtwXJJKNzWY/edit?usp=sharing
PDF snapshot attached.
Attachment:
Tile_Installation_Index - TESTING&BURNIN-1.pdf
Description: Adobe PDF document
- [Sphenix-hcal-l] Current Testing & Calibration Run List, Daniel Richford, 06/02/2021
Archive powered by MHonArc 2.6.24.