For all those people working on calibration and data-analysis of testing data, here is a preliminary list of runs to look at.

Assembly-phase: Currently, only cosmics data (differences from nominal VOP noted as necessary). I am going through various logs and lists to find the assembly-phase test data, which has already long been looked at.

Pre-Burn-In phase: Tests & cosmics (nominal Vop was used for all sectors) (only the bottom half of the sectors have runs, here).

Post-burn-in phase: Only a few sectors have made it here.

Future updates: Will add list for special runs (first rotation test, variable voltage cosmics, variable voltage led, 200min-cosmics, low-gain runs, etc. And, we'll update the list as new data comes up!

You can view the database here: https://docs.google.com/spreadsheets/d/1rIUAVjWNd7wE9ms2BfCqUAGH0KbNNxG7OtwXJJKNzWY/edit?usp=sharing

PDF snapshot attached.

Attachment: Tile_Installation_Index - TESTING&BURNIN-1.pdf
Description: Adobe PDF document



  • [Sphenix-hcal-l] Current Testing & Calibration Run List, Daniel Richford, 06/02/2021

Archive powered by MHonArc 2.6.24.

Top of Page