Skip to Content.
Sympa Menu

sphenix-l - Re: [Sphenix-l] [Sphenix-physics-l] near final draft

sphenix-l AT lists.bnl.gov

Subject: sPHENIX is a new detector at RHIC.

List archive

Chronological Thread  
  • From: "Frawley, Anthony" <afrawley AT fsu.edu>
  • To: David Morrison <dave AT bnl.gov>, "sphenix-physics-l AT lists.bnl.gov" <sphenix-physics-l AT lists.bnl.gov>, "sphenix-l AT lists.bnl.gov" <sphenix-l AT lists.bnl.gov>
  • Subject: Re: [Sphenix-l] [Sphenix-physics-l] near final draft
  • Date: Mon, 6 Jun 2016 02:36:01 +0000

Dear Dave and Gunther,


From a very quick look, one statement caught my eye:


Line 567:

"For a given b-jet purity, the reduced VTX pixel single track efficiency implies a  50%

lower b-jet efficiency than the MAPS based solution, in addition to the reduced tagging efficiency
due to the lower DCA resoluton."

It sounds like this assumes only two tracks are used in the B jet tagging (the single track efficiency for the pixels is lower by a factor of ~ 0.7). But I thought that the preferred tagging method uses three large-DCA tracks, which would imply an efficiency lower by a factor of ~ 0.34. It would be good, in any case, to mention what goes into that 50% number.


Cheers

Tony




From: sphenix-physics-l-bounces AT lists.bnl.gov <sphenix-physics-l-bounces AT lists.bnl.gov> on behalf of David Morrison <dave AT bnl.gov>
Sent: Sunday, June 5, 2016 8:33 PM
To: sphenix-physics-l AT lists.bnl.gov; sphenix-l AT lists.bnl.gov
Subject: [Sphenix-physics-l] near final draft
 
Dear collaborators,

There was a very good discussion of the response to the ALD’s charge at the Friday general meeting, and here is a draft that incorporates some of the advice we received.  For example, there is now a table of scenarios in the executive summary.  There is also an appendix with summary budget numbers.  We’d like to consider this draft provisionally final (we’d turn off the line numbers in the truly final version of course), but we’d be happy for any specific comments by noon ET on Monday.  After the Friday meeting, we had arranged with Berndt Mueller to move the deadline from Friday to Monday.


I’m tripping over some technical problems trying to produce a diff between this version and the previous one, but if I manage to overcome those I’ll post a link to a diff too.

Regards,
Dave and Gunther

David Morrison Brookhaven National Laboratory phone: 631-344-5840
Physics Department, Bldg 510 C email: dave AT bnl.gov
Upton, NY 11973-5000








Archive powered by MHonArc 2.6.24.

Top of Page