Hi Dave and Gunther,

Thanks for pulling this all together. I wanted to do a careful read through but didn't make it through all the appendices yet. Here are the comments I found tonight.

Best,
-Megan


-In the executive summary, it doesn't really describe what the delta cost savings is in reference to. 
-L87 you list 6 subsystems but in 89 say 5
-L139-141 I'm not sure you want to include this sentence here since you are explaining the reference design and the 2 layers is really a descoped version.
-L152 comma after 0.9
-L170 "effect" to "effect on"
-L173 "The would" to "This would"
-L204 maybe add something like "2 layers instead of 3 layers" to indicate that this is a reduction from the ideal reference design
-Table 1.1 I think the line between the Maps and the vtx reuse can be removed since these are really one decision item. If you remove the line you can remove the "see Maps above"
-Table 1.2 isn't described in the text. I think in Section 1.6 you could add something like "Table 1.2 lists additional options that were considered. However, these options are excluded from table 1.1 due to the significant impact they have on the project schedule, infrastructure and damage to the physics program especially when combined with any other modifications to the calorimetery system."
-L223 "pTDR" to "pCDR"
-L268 "sphenix" to "sPHENIX"
-L296 "Hcal" to "HCal"
(maybe check for other inconsistencies like the 2 above)



On Sun, Jun 5, 2016 at 8:33 PM, David Morrison <dave AT bnl.gov> wrote:
Dear collaborators,

There was a very good discussion of the response to the ALD’s charge at the Friday general meeting, and here is a draft that incorporates some of the advice we received.  For example, there is now a table of scenarios in the executive summary.  There is also an appendix with summary budget numbers.  We’d like to consider this draft provisionally final (we’d turn off the line numbers in the truly final version of course), but we’d be happy for any specific comments by noon ET on Monday.  After the Friday meeting, we had arranged with Berndt Mueller to move the deadline from Friday to Monday.


I’m tripping over some technical problems trying to produce a diff between this version and the previous one, but if I manage to overcome those I’ll post a link to a diff too.

Regards,
Dave and Gunther

David Morrison Brookhaven National Laboratory phone: 631-344-5840
Physics Department, Bldg 510 C email: dave AT bnl.gov
Upton, NY 11973-5000






_______________________________________________
Sphenix-l mailing list
Sphenix-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-l





Archive powered by MHonArc 2.6.24.

Top of Page