Hi Ed,

Very nice! Is this a photo taken from South? Do you have one from North view?

Cheers,
Ming



-----


Dr. Ming Xiong Liu
P-3, MS H846
Physics Division

Office: 505.667.7125
Mobile: 505.412.7396
Los Alamos National Laboratory





On 2/7/23, 1:49 PM, "sPHENIX-l on behalf of Edward O'Brien via sPHENIX-l"
<sphenix-l-bounces AT lists.bnl.gov <mailto:sphenix-l-bounces AT lists.bnl.gov> on
behalf of sphenix-l AT lists.bnl.gov <mailto:sphenix-l AT lists.bnl.gov>> wrote:


Hi all,
The beryllium beam pipe has been installed in the bore of the
sPHENIX detector, see attached. By tomorrow the sPHENIX beam pipe
will be attached to the beam pipes of the RHIC ring and pump down
will begin. We're getting close to the end of installation and the
beginning of an experiment. Thanks.


Ed
_______________________________________________
sPHENIX-l mailing list
sPHENIX-l AT lists.bnl.gov <mailto:sPHENIX-l AT lists.bnl.gov>
https://lists.bnl.gov/mailman/listinfo/sphenix-l
<https://lists.bnl.gov/mailman/listinfo/sphenix-l>








Archive powered by MHonArc 2.6.24.

Top of Page