Re: [Sphenix-l] Beam pipe installed in bore of sPHENIX
- From: "Yip, Kin" <kinyip AT bnl.gov>
- To: "Liu, Ming" <ming AT bnl.gov>, "O'Brien, Edward" <eobrien AT bnl.gov>, "sphenix-l AT lists.bnl.gov" <sphenix-l AT lists.bnl.gov>
- Subject: Re: [Sphenix-l] Beam pipe installed in bore of sPHENIX
- Date: Wed, 8 Feb 2023 15:20:30 +0000
I believe Ed's photo was from the North. I just took one
from the South (attached).
Kin
-------- Original message --------
From: Ming Liu via sPHENIX-l <sphenix-l AT lists.bnl.gov>
Date: 2/8/23 8:58 AM (GMT-05:00)
To: "O'Brien, Edward" <eobrien AT bnl.gov>, sphenix-l AT lists.bnl.gov
Subject: Re: [Sphenix-l] Beam pipe installed in bore of sPHENIX
Hi Ed,
Very nice! Is this a photo taken from South? Do you have one from North view?
Cheers,
Ming
-----
Dr. Ming Xiong Liu
P-3, MS H846
Physics Division
Office: 505.667.7125
Mobile: 505.412.7396
Los Alamos National Laboratory
On 2/7/23, 1:49 PM, "sPHENIX-l on behalf of Edward O'Brien via sPHENIX-l" <sphenix-l-bounces AT lists.bnl.gov <mailto:sphenix-l-bounces AT lists.bnl.gov> on behalf of sphenix-l AT lists.bnl.gov <mailto:sphenix-l AT lists.bnl.gov>> wrote:
Hi all,
The beryllium beam pipe has been installed in the bore of the
sPHENIX detector, see attached. By tomorrow the sPHENIX beam pipe
will be attached to the beam pipes of the RHIC ring and pump down
will begin. We're getting close to the end of installation and the
beginning of an experiment. Thanks.
Ed
_______________________________________________
sPHENIX-l mailing list
sPHENIX-l AT lists.bnl.gov <mailto:sPHENIX-l AT lists.bnl.gov>
https://lists.bnl.gov/mailman/listinfo/sphenix-l <https://lists.bnl.gov/mailman/listinfo/sphenix-l>
_______________________________________________
sPHENIX-l mailing list
sPHENIX-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-l
Very nice! Is this a photo taken from South? Do you have one from North view?
Cheers,
Ming
-----
Dr. Ming Xiong Liu
P-3, MS H846
Physics Division
Office: 505.667.7125
Mobile: 505.412.7396
Los Alamos National Laboratory
On 2/7/23, 1:49 PM, "sPHENIX-l on behalf of Edward O'Brien via sPHENIX-l" <sphenix-l-bounces AT lists.bnl.gov <mailto:sphenix-l-bounces AT lists.bnl.gov> on behalf of sphenix-l AT lists.bnl.gov <mailto:sphenix-l AT lists.bnl.gov>> wrote:
Hi all,
The beryllium beam pipe has been installed in the bore of the
sPHENIX detector, see attached. By tomorrow the sPHENIX beam pipe
will be attached to the beam pipes of the RHIC ring and pump down
will begin. We're getting close to the end of installation and the
beginning of an experiment. Thanks.
Ed
_______________________________________________
sPHENIX-l mailing list
sPHENIX-l AT lists.bnl.gov <mailto:sPHENIX-l AT lists.bnl.gov>
https://lists.bnl.gov/mailman/listinfo/sphenix-l <https://lists.bnl.gov/mailman/listinfo/sphenix-l>
_______________________________________________
sPHENIX-l mailing list
sPHENIX-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-l
Attachment:
20230208_101152.jpg
Description: 20230208_101152.jpg
-
[Sphenix-l] Beam pipe installed in bore of sPHENIX,
Edward O'Brien, 02/07/2023
- Re: [Sphenix-l] Beam pipe installed in bore of sPHENIX, Ming Liu, 02/08/2023
- <Possible follow-up(s)>
-
Re: [Sphenix-l] Beam pipe installed in bore of sPHENIX,
Yip, Kin, 02/08/2023
- Re: [Sphenix-l] Beam pipe installed in bore of sPHENIX, Ming Liu, 02/08/2023
Archive powered by MHonArc 2.6.24.