Dear
All,
A
quick
update,
we
just
finished
closing
successfully
the
two
INTT
detector
halves
around
the
aluminum
beam
pipe
at
the
sPHENIX
IR.
The
aluminum
guides
between
the
INTT
detector
and
the
CFC
tube
inside
TPC
were
installed
and
making
INTT
ready
to
be
rolled
inside
the
TPC
and
around
the
beryllium
beam.
The
beam
pipe sensor probes for
monitoring,
the
plots
were
very
stable,
and
no
indication
of
any
type
of
vibration.
Tasks
for
tomorrow
morning
(after
the
daily
meeting
at
8:30
am):
1- installed beam support
2- roll in the INTT inside the TPC and around the beryllium beam pipe.
Many
people
contributed,
and
it
is
very
hard
to
mention all the names.
Many thanks to the sPHENIX,
and CAD technicians and engineers; the way you handled the INTT detector installation
showed resilience, experience, knowledge, and critical thinking.
Special
thanks to Dan Cacace, Robert Pisani, Nick
Seberg,
and
James
LaBounty,
they
did
not
give
up,
and
you were amazing.
Important
note:
As
Frank
Toldo
requested,
the
north
side
was
posted
with
yellow
tape.
People
should
not
go
to
the
north-side scaffolding.
Thank you all.
Sincerely,
Rachid
for
the
INTT
group
-- /_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/ / / Rachid Nouicer / / Brookhaven National Laboratory / / / / Address: / / Brookhaven National Laboratory (BNL) / / Physics Department, Building 510c / / 20 Pennsylvania Avenue / / Upton, New York, 11973, U.S.A. /Phone:+1 631 344 8433/ / / E-mail : rachid.nouicer AT bnl.gov / Fax:+1 631 344 3253 / Web:http://www4.rcf.bnl.gov/~nouicer / / / / /_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/
-
[Sphenix-l] INTT installation around beam pipe,
nouicer, 02/28/2023
-
[Sphenix-l] INTT installation around beam pipe,
nouicer, 02/28/2023
-
Re: [Sphenix-l] INTT installation around beam pipe,
Gunther M Roland, 02/28/2023
- Re: [Sphenix-l] INTT installation around beam pipe, Neeraj Gupta, 02/28/2023
-
Re: [Sphenix-l] INTT installation around beam pipe,
Gunther M Roland, 02/28/2023
- Re: [Sphenix-l] INTT installation around beam pipe, Edward O'Brien, 02/28/2023
-
[Sphenix-l] INTT installation around beam pipe,
nouicer, 02/28/2023
Archive powered by MHonArc 2.6.24.