sphenix-l AT lists.bnl.gov
Subject: sPHENIX is a new detector at RHIC.
List archive
Re: [Sphenix-l] INTT installation around beam pipe
- From: Gunther M Roland <rolandg AT mit.edu>
- To: "Rachid.Nouicer AT bnl.gov" <rachid.nouicer AT bnl.gov>
- Cc: "sphenix-l AT lists.bnl.gov" <sphenix-l AT lists.bnl.gov>
- Subject: Re: [Sphenix-l] INTT installation around beam pipe
- Date: Wed, 1 Mar 2023 03:23:07 +0000
Congratulations to the INTT crew and everyone who helped with the installation so far! Hoping for more good news soon.
On Feb 28, 2023, at 10:14 PM, nouicer via sPHENIX-l <sphenix-l AT lists.bnl.gov> wrote:
_______________________________________________Dear All,
A quick update, we just finished closing successfully the two INTT detector halves around the aluminum beam pipe at the sPHENIX IR.
The aluminum guides between the INTT detector and the CFC tube inside TPC were installed and making INTT ready to be rolled inside the TPC and around the beryllium beam.
The beam pipe sensor probes for monitoring, the plots were very stable, and no indication of any type of vibration.
Tasks for tomorrow morning (after the daily meeting at 8:30 am):
1- installed beam support
2- roll in the INTT inside the TPC and around the beryllium beam pipe.
Many people contributed, and it is very hard to mention all the names.
Many thanks to the sPHENIX, and CAD technicians and engineers; the way you handled the INTT detector installation showed resilience, experience, knowledge, and critical thinking.
Special thanks to Dan Cacace, Robert Pisani, Nick Seberg, and James LaBounty, they did not give up, and you were amazing.
Important note: As Frank Toldo requested, the north side was posted with yellow tape. People should not go to the north-side scaffolding.
Thank you all.
Sincerely,
Rachid for the INTT group
-- /_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/ / / Rachid Nouicer / / Brookhaven National Laboratory / / / / Address: / / Brookhaven National Laboratory (BNL) / / Physics Department, Building 510c / / 20 Pennsylvania Avenue / / Upton, New York, 11973, U.S.A. /Phone:+1 631 344 8433/ / / E-mail : rachid.nouicer AT bnl.gov / Fax:+1 631 344 3253 / Web:http://www4.rcf.bnl.gov/~nouicer / / / / /_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/
sPHENIX-l mailing list
sPHENIX-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-l
-
[Sphenix-l] INTT installation around beam pipe,
nouicer, 02/28/2023
-
[Sphenix-l] INTT installation around beam pipe,
nouicer, 02/28/2023
-
Re: [Sphenix-l] INTT installation around beam pipe,
Gunther M Roland, 02/28/2023
- Re: [Sphenix-l] INTT installation around beam pipe, Neeraj Gupta, 02/28/2023
-
Re: [Sphenix-l] INTT installation around beam pipe,
Gunther M Roland, 02/28/2023
- Re: [Sphenix-l] INTT installation around beam pipe, Edward O'Brien, 02/28/2023
-
[Sphenix-l] INTT installation around beam pipe,
nouicer, 02/28/2023
Archive powered by MHonArc 2.6.24.