Skip to Content.
Sympa Menu

sphenix-l - Re: [Sphenix-l] [EXTERNAL] The MVTX has been tested

sphenix-l AT lists.bnl.gov

Subject: sPHENIX is a new detector at RHIC.

List archive

Chronological Thread  
  • From: "Liu, Ming Xiong" <mliu AT lanl.gov>
  • To: "Dean, Cameron" <cdean AT bnl.gov>, "Sphenix-l AT lists.bnl.gov" <sphenix-l AT lists.bnl.gov>, "SPHENIX MVTX " <sphenix-maps-l AT lists.bnl.gov>, "Sondheim, Walter E" <sondheim AT lanl.gov>, Joe Dodge <jdodge AT mit.edu>, "La Bounty, James" <labounty AT bnl.gov>, "Toldo, Frank A" <fatoldo AT bnl.gov>
  • Subject: Re: [Sphenix-l] [EXTERNAL] The MVTX has been tested
  • Date: Thu, 7 Dec 2023 22:48:44 +0000

Cameron, Hao-Ren, Yasser, Jakub and all,

 

This is fantastic news, and congratulations to the whole team to take out the MVTX safely from IR!

Attached are a few random photos of the actions.

 

Cheers,

 

Ming

 

-- 

Dr. Ming Xiong Liu

P-3, MS H846

Physics Division

 

Office: 505.667.7125

Mobile: 505.412.7396

Los Alamos National Laboratory

 

From: sPHENIX-l <sphenix-l-bounces AT lists.bnl.gov> on behalf of sPHENIX-l <sphenix-l AT lists.bnl.gov>
Reply-To: Cameron Dean <cdean AT bnl.gov>
Date: Thursday, December 7, 2023 at 3:36 PM
To: sPHENIX-l <sphenix-l AT lists.bnl.gov>
Subject: [EXTERNAL] [Sphenix-l] The MVTX has been tested

 

Dear collaborators,

We wanted to let you know that we have just finished testing the MVTX after we removed it from the IR and transported it to 1008. We’re happy to report that there has been no damage. That means all staves and chips responded to tests, with over 99.99% of pixels operating. As well as this, there was also no damage to the beam pipe or vacuum from the removal (that has been reported to us and the vacuum was being monitored for the entire removal).

The complete removal of the MVTX and supporting structure has now freed the south face of sPHENIX for the ROC removal and the next stage of TPC repairs. I’m sure we’re all looking forward to both a successful repair and a successful physics year in 2024.

Obviously, the successful removal couldn’t have been achieved without the hard work of many people at 1008 and beyond, with many technicians, engineers, riggers and surveyors keeping me right through those steps so I’d like to say thank you to them for all they did.

Cheers,
Cameron, for the MOSAIC test team of Yasser, Hao-Ren, Jakub and myself.

Attachment: MVTX-tested-gold-120723.jpg
Description: MVTX-tested-gold-120723.jpg

Attachment: MVTX-removal-IR-Joe-Walt-Jim.jpg
Description: MVTX-removal-IR-Joe-Walt-Jim.jpg

Attachment: MVTX-removal-IR2.jpg
Description: MVTX-removal-IR2.jpg



  • Re: [Sphenix-l] [EXTERNAL] The MVTX has been tested, Liu, Ming Xiong, 12/07/2023

Archive powered by MHonArc 2.6.24.

Top of Page