Hi All,
The repair to the magnet return bus in the blue ring will take at least 3 weeks (the location of the short is as of yet unknown).  As of this Friday at 4 pm, we will switch back to 2 person shifts until April 22nd.  (There is a chance we even reduce to 2 person shifts until April 29th, we will know more on Friday.)  This means we only need the Shift Leader and Detector Operator and Period Coordinator during that time.  The DAQ operator and Data Monitor people do not have to show up, and their institutions will receive shift credit.

There is a chance that we do not have a summer shutdown.  We will let everyone know as more information becomes available.  On top of the uncertainty of this repair, we do not as of yet know what the budgets are in order to know how many weeks we will have.

Regards,
Rosi and Ron
sPHENIX Run Coordination 2025



--
Rosi Reed
Associate Professor, Physics Department
Lehigh University
(610)758-3907
16 Memorial Drive East Office 406
Bethlehem, PA 18015
she/her/hers


  • [[Sphenix-l] ] sPHENIX -> 2 person shifts until April 22nd, Rosi Reed, 04/01/2025

Archive powered by MHonArc 2.6.24.

Top of Page