sphenix-magnet-l - Re: [Sphenix-magnet-l] Mod to Low Field Cable Tray

sphenix-magnet-l AT lists.bnl.gov

Subject: sPHENIX discussion of the superconducting solenoid

List archive

Chronological Thread  
  • From: "Mills, James A" <mills AT bnl.gov>
  • To: "Yip, Kin" <kinyip AT bnl.gov>, "Giannotti, Paul" <gia AT bnl.gov>, "Phillips, David B" <phillips AT bnl.gov>, "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>, "Rau, Michael" <mrau AT bnl.gov>
  • Subject: Re: [Sphenix-magnet-l] Mod to Low Field Cable Tray
  • Date: Fri, 11 Dec 2015 17:53:49 +0000

Great, thanks guys for keeping this going.  Have a nice weekend.

Jim

 

From: sphenix-magnet-l-bounces AT lists.bnl.gov [mailto:sphenix-magnet-l-bounces AT lists.bnl.gov] On Behalf Of Kin Yip
Sent: Friday, December 11, 2015 12:07 PM
To: Giannotti, Paul; Phillips, David B; sphenix-magnet-l AT lists.bnl.gov; Rau, Michael
Subject: Re: [Sphenix-magnet-l] Mod to Low Field Cable Tray

 

Just managed to find Dave and he's going to try to look for a lift ASAP ....

On 12/11/2015 11:32 AM, Giannotti, Paul wrote:

Hi Dave,

 

Update on malfunctioning lift……….Bill Schmidtz (CAD electrician that has knowledge on repairing man-lift controls) just called Mike Rau to report the problem is the vendor control unit which controls the steering mechanism is faulty. This may require ordering parts from the vendor and, in my opinion, will cause further delay in completing the tray work.

 

Can another lift be located for use ASAP?

 

I reviewed the modified tray sketch and see it involves only location of racks below the overhead tray section. No extra work is required from original plan.

 

Thanks,

Paul

 

From: <sphenix-magnet-l-bounces AT lists.bnl.gov> on behalf of David Phillips <phillips AT bnl.gov>
Date: Friday, December 11, 2015 at 11:16 AM
To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>, "Yip, Kin" <kinyip AT bnl.gov>, "Rau, Michael" <mrau AT bnl.gov>
Subject: [Sphenix-magnet-l] Mod to Low Field Cable Tray

 

Attached a modified sketch of the cable tray and racks for the Low Field Test.

The change is moving the Power Supply rack 10” south so it is not on top of the cross trench.

 

David Phillips

Building 911B

Upton, NY 11973

631-344-4671, Fax 631-344-5954, Cell 631-804-9477

 

 