[Sphenix-magnet-l] Paul finished earlier afternoon ... need to talk to the Cryo group when putting in the heat shield
- From: Kin Yip <kinyip AT bnl.gov>
- To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Subject: [Sphenix-magnet-l] Paul finished earlier afternoon ... need to talk to the Cryo group when putting in the heat shield
- Date: Tue, 12 Jan 2016 16:36:19 -0500
Hi Ray, I called Paul Giannotti at 3:25:51 pm (from my phone log) and Paul told me that he and Frank Toldo had finished unplugging and plugging the strain gauge cables and done some testing (for the continuity). Paul showed me his work in 912. Paul showed me that there was a cable (inside the doghouse) marked as "shield" which needs to be attached to the heat shield somehow. Ray: please do talk to the Cryo group (Tom Tallerico/Rich Meier ...) about closing the doghouse. The Cryo may have their ideas .... (testing/connecting) ... The Cryo group (I saw Tom Tallerico and Rich Meier this afternoon) were (or even are) still testing their connections >30 minutes ago when I was there. Then, Paul and I went to Bldg. 902. I saw 1 rack with power supply down on the floor ... and we finally found Piyush and Sonny in a room upstairs and they're testing the Quench Detector/DAQ rack. Next Tue., they'll take that rack down to their floor (in Bldg. 902) --- which had house Cosmotron ~60 years ago and I saw the circular track left on the floor (... probably more than 1 person told me before but I've never quite registered it in my brain ... Writing it down may help) --- and tested. They plan to take both racks to 912 on Jan. 22 and test again in 912. Kin On 01/12/2016 04:09 PM, Phillips, David
B wrote:
Shouldn’t this be sent to Ray C?
From:
Yip, Kin
Paul has done dealing with strain gauge such that he doesn't mind closing doghouse now. He just showed you.
Sent from my Verizon 4G LTE Smartphone
------ Original message------ From: Sanfilippo, Joseph W Date: Tue, Jan 12, 2016 15:15 To: Yip, Kin;Mills, James A;Giannotti, Paul; Cc: Phillips, David B; Subject:RE: strain gauge ?
Sorry about not seeing your e-mails till now, I just got into work a short time ago. I talked to Paul about 45 minutes ago and he told me that Frank Toldo and himself was going to take care of the work at S-PHENIX. If that’s not so contact me and I will about helping you out and send a CAS tech.
Joe
From:
Kin Yip [mailto:kinyip AT bnl.gov]
Hi, On 01/12/2016 09:12 AM, Mills, James A wrote:
Hi Paul, On 01/11/2016 04:53 PM, Kin Yip wrote:
|