Re: [Sphenix-magnet-l] Valve Box closed. ---- Cryo group piping ?
- From: Kin Yip <kinyip AT bnl.gov>
- To: "Than, Yatming (Roberto)" <ythan AT bnl.gov>, "Ceruti, Raymond B" <rayc AT bnl.gov>
- Cc: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Subject: Re: [Sphenix-magnet-l] Valve Box closed. ---- Cryo group piping ?
- Date: Fri, 22 Jan 2016 17:40:57 -0500
Dear Roberto, Thanks for the update. I hope the snow won't give us any delay :-( :-) Kin On 01/22/2016 02:55 PM, Than, Yatming
(Roberto) wrote:
Once all vacuum boundaries are closed up we can pumpdown the insulating vacuum space with a temporary setup. The Leybold turbos are not ready.
Still working on misc items and prepping for the ERL side cut and cap for next week.
R.
From:
sphenix-magnet-l-bounces AT lists.bnl.gov
[mailto:sphenix-magnet-l-bounces AT lists.bnl.gov]
On Behalf Of Kin Yip
Hi, On 01/22/2016 11:13 AM, Ceruti, Raymond B wrote:
|
-
[Sphenix-magnet-l] Valve Box closed. ---- Cryo group piping ?,
Kin Yip, 01/22/2016
-
Re: [Sphenix-magnet-l] Valve Box closed. ---- Cryo group piping ?,
Than, Yatming (Roberto), 01/22/2016
- Re: [Sphenix-magnet-l] Valve Box closed. ---- Cryo group piping ?, Kin Yip, 01/22/2016
-
Re: [Sphenix-magnet-l] Valve Box closed. ---- Cryo group piping ?,
Than, Yatming (Roberto), 01/22/2016
Archive powered by MHonArc 2.6.24.