[Sphenix-magnet-l] all safety procedures completed ... the last 10 K does need more efforts ... low-field test this coming Monday
- From: "Yip, Kin" <kinyip AT bnl.gov>
- To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Subject: [Sphenix-magnet-l] all safety procedures completed ... the last 10 K does need more efforts ... low-field test this coming Monday
- Date: Thu, 17 Mar 2016 20:40:50 +0000
Hi,
Ø ) I’m not sure the last 10 K or several K will need more time or less time ….
The last 10 K really seems to take more effort. Around last midnight (between Wed. and Thur.), the coil temperatures went down to between 13-14 K (in absolute temperature scale). Since those He gas itself is at this temperature, they couldn’t cool it further. This morning, soon after 7:30 am, they stop the He flow as they need to build liquid He inventory so that they can cool it to 4.5 K. Right now, the LHe Storage that I can check from “D405 ERL CryoFab LHe Storage” is ~52%. Roberto would like it to be above 60% and this should be reached sometime tomorrow.
Right now, the magnet coil temperatures have been rising ---- which gave us a chance to see how fast temperature increases as this is the way how natural warm-up would happen to 10 K (for us to measure resistance at 10 K => RRR). It seems to be faster than what Roberto had expected … something like 1 K per hour or so.
So, after they build up the inventory and they’ll cool again back down to ~10 K and switch to use the Liquid He to cool it towards ~4.5 K which should hopefully be reached in the weekend.
Meanwhile, we have done a few things today :
--- Achim Franz has moved his cart to the designated area; --- Dave and I have just accompanied Jesse Fite and done the “Magnet Safety Review”. We’ve cleaned up a few things (eg. moving carts with metals away from the magnet) and Jesse has placed a sticker on the Solenoid (see attached photo). I’ve signed off this in the check-off list. --- While Jesse was there, we have placed the 5 G chain around the magnet to show what the chain would be. Jesse was happy about this. I’ve asked Peter Cirnigliaro to sign off on this.
As a result, we’ve finished all the checkoff list(s) and safety procedure for the low-field test.
So, we (such as Sonny/Joe) will meet on Monday at 9: 30 am at the sPHENIX Magnet (Bldg. 912) to start doing the low-field test …..
Kin
|
Attachment: