sphenix-magnet-l AT lists.bnl.gov
Subject: sPHENIX discussion of the superconducting solenoid
List archive
- From: "Than, Yatming (Roberto)" <ythan AT bnl.gov>
- To: "Yip, Kin" <kinyip AT bnl.gov>, "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Subject: Re: [Sphenix-magnet-l] Linear Pot. during warmup
- Date: Thu, 7 Apr 2016 16:15:44 +0000
I thought we expected 7 mm.
From: sphenix-magnet-l-bounces AT lists.bnl.gov [mailto:sphenix-magnet-l-bounces AT lists.bnl.gov]
On Behalf Of Yip, Kin
Hi,
Somebody asked about it during yesterday’s meeting, I attach the plot of the linear potentiometer during warmup for pot. 1, 2 and 3. I tried to readjust all the pots. on Mar. 22 (late afternoon) before warming up so that they would have the entire range. Ray Ceruti determined that Pot. 4 just didn’t latch to anything or was unreachable and we gave up on it.
My attached plots show the movements for pots 1, 2 and 3. Pots 2 & 3 are on opposite ends, and so are pots 1 & 4. Pots 2 & 3 rose to about ~0.3 mm as expected.
But pot 1 didn’t rise for a while until ~half way and then rose to just about 0.2 mm. Is it possible that pot. 4 pulled the pot. 1 or something like that ?! …..
Kin |
-
[Sphenix-magnet-l] Linear Pot. during warmup,
Yip, Kin, 04/07/2016
- Re: [Sphenix-magnet-l] Linear Pot. during warmup, Yip, Kin, 04/07/2016
-
Re: [Sphenix-magnet-l] Linear Pot. during warmup,
Than, Yatming (Roberto), 04/07/2016
- Re: [Sphenix-magnet-l] Linear Pot. during warmup, Kin Yip, 04/07/2016
Archive powered by MHonArc 2.6.24.