sphenix-magnet-l AT lists.bnl.gov
Subject: sPHENIX discussion of the superconducting solenoid
List archive
Re: [Sphenix-magnet-l] Is it possible to disconnect the junction box from the valvebox before May 6 ?
- From: Kin Yip <kinyip AT bnl.gov>
- To: "Ceruti, Raymond B" <rayc AT bnl.gov>, "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>, "Meier, Richard" <remeier AT bnl.gov>
- Subject: Re: [Sphenix-magnet-l] Is it possible to disconnect the junction box from the valvebox before May 6 ?
- Date: Wed, 20 Apr 2016 16:35:13 -0400
Hi, Ray, The Cryo group is disconnecting now or has disconnected their cables etc. (including those electrical ones), as Paul Orfin told us in the meeting. Paul Giannotti in Physics has promised to find techs (Frank ?) to disconnect what they need to do (such as strain gauge cables), by the end of this week. Maybe, can you take a look next Monday and let us know what needs MORE need to be done ? Dave Phillips is trying to install the "scaffolding" (ladder) next Monday. Kin On 04/20/2016 04:18 PM, Ceruti, Raymond
B wrote:
Hi All, All wiring and related instrumentation will have to be disconnected beforehand, then we will cut the Helium tubing and disconnect the leads. Once all is disconnected up top such as the piping and electrical connection etc., we will then be able to work with the riggers to lift the valve box off of the solenoid triangle. As you can see there will be a fair amount of work coordination to accomplish this disconnection.
Regards, Ray
From:
Kin Yip [mailto:kinyip AT bnl.gov]
Hi Mike and
Ray, |
- Re: [Sphenix-magnet-l] Is it possible to disconnect the junction box from the valvebox before May 6 ?, Kin Yip, 04/20/2016