[Sphenix-magnet-l] Brief Summary of sPHENIX Magnet Biweekly meeting (May 18, 2016)
- From: Kin Yip <kinyip AT bnl.gov>
- To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Subject: [Sphenix-magnet-l] Brief Summary of sPHENIX Magnet Biweekly meeting (May 18, 2016)
- Date: Wed, 18 May 2016 16:56:06 -0400
Agenda / powerpoint : https://indico.bnl.gov/conferenceDisplay.py?confId=2099 (1) We've discussed about the return yoke works as mentioned in the agenda powerpoint. In addition, D. Phillips told us that we're trying to learn to use the driller to drill holes and there are additional bases need to be installed on both sides of the base that has been installed now : https://collab.external.bnl.gov/sites/sPHENIX-Magnet/Pictures/High%20Field%20Test/The%20base%20of%20the%20return%20yoke.jpg (2) P. Giannotti showed the BaBar literature he's found from loose (BaBar) notes kept the PHENIX trailer : "Power Supply & Controls" Dump Resistor Connections.pdf The experts (C. Schultheiss, D. Phillips, P. Joshi and P. Giannotti) have had some interesting discussion about the dump resistors and the cables connecting to the power supply. In the meeting, D. Phillips told us that he'd design the "flags" so that ~12 cables would attach to each of the +/- power leads on the platform. (3) A bit surprisingly (to me), after further investigation (thanks !), Zeynep has reported that the existing ADC board that may not have enough bits to deal with the required data (for temperature correction etc.). [ I was surprised because they seemed to think that existing board should be good enough a week ago or so. ] We may need the help of Winston Pekrul to write some interface which may take 2 months. We'll have a small separate meeting to discuss about this (Carl is orgazing it). (4) People are wondering again whether the strain gauges are useful. But at least, we may use them relatively such that they go back to the strain values that they should be at certain particular current etc. Joe Muratore has agreed to look for some limits etc. so that we write them down in our Traveler/instructions for the High-Field test. (5) J. Mills asked about the schedule. D. Phillips still haven't quite finished doing his schedule for building the return yoke (though he said he'd started) so that he couldn't tell us yet. (6) Since I'll be in a conference in Elba Island in Italy the week on June 1, 2016, I've proposed that the next meeting will be on June 8, 2016, 3 weeks from today. Nobody seemed to object to it and Jim seemed to like it so that this Magnet meeting will be in alternative week from his Engineering meeting. Kin |
- [Sphenix-magnet-l] Brief Summary of sPHENIX Magnet Biweekly meeting (May 18, 2016), Kin Yip, 05/18/2016
Archive powered by MHonArc 2.6.24.