Skip to Content.
Sympa Menu

sphenix-magnet-l - [Sphenix-magnet-l] FW: linear pots

sphenix-magnet-l AT lists.bnl.gov

Subject: sPHENIX discussion of the superconducting solenoid

List archive

Chronological Thread  
  • From: "Yip, Kin" <kinyip AT bnl.gov>
  • To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
  • Subject: [Sphenix-magnet-l] FW: linear pots
  • Date: Wed, 28 Jun 2017 15:05:59 +0000

Hi,

 

Thanks Sonny and Dominic (from Superconducting Magnet Division) help us dealing with the linear pot.

 

I’ve kept remembering this thing … and that we need to put the linear pot. wires/cables out of the hole for extension before we close up

the steel construction.

 

It seems that due to more time needed for the survey, Jon Hock and Dave Phillips have moved the move to Thursday morning so that

the survey group can take the time to do their survey (today).   Jon told me that he needed to re-send a drawing to them yesterday (as

something was missed in the original attempt).

 

Kin

 

From: Dimaiuta, Sebastian A
Sent: Wednesday, June 28, 2017 8:01 AM
To: Yip, Kin <kinyip AT bnl.gov>
Subject: linear pots

 

Hi Kin

                    Me and Dominic went down and attached cables to the Terminal blocks for the linear pots, after the magnet is installed in the iron, and before they start closing up the iron we need to get there and route one of the cables to the dog house area. I have attached some pictures.

                                                                                                                                                                                                                                  Sonny

                                                                                                                                                                                                                 

 

                                                                                 Sebastian Dimaiuta,

                                                                                                   Technical Project Supervisor,

                                                                           Magnet Division,

                                                                                             X5265, cell (631)599-1357.

 

Attachment: DSCN2321.JPG
Description: DSCN2321.JPG

Attachment: DSCN2323.JPG
Description: DSCN2323.JPG



  • [Sphenix-magnet-l] FW: linear pots, Yip, Kin, 06/28/2017

Archive powered by MHonArc 2.6.24.

Top of Page