[Sphenix-magnet-l] Only two doors were left open at the junction box (Magnet/Extension)
- From: Kin Yip <kinyip AT bnl.gov>
- To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Subject: [Sphenix-magnet-l] Only two doors were left open at the junction box (Magnet/Extension)
- Date: Fri, 11 Aug 2017 17:14:27 -0400
Hi, Ray Ceruti sent me two pictures at 2:38 pm and I put them in the following zip file : https://collab.external.bnl.gov/sites/sPHENIX-Magnet/Pictures/High%20Field%20Test/Junction%20box%20(Magnet-Extension)%20wrapped%20up%20insde.zip Ray wants "everybody" to check the connections to avoid having to open this junction-box again/ever. Joe Dambra/Domenick M. from SMD will come to Bldg. 912 to do a 1 A test at around 10 am on Monday and at 1 pm Sonny will bring his "hipot machine" to do a hipot test. Richard Meier (whom I've talked with) and Frank Toldo (whom I haven't been able to talk to today as he's out) will/should do some test to make sure that their connections are good. Hopefully everything is good and then Ray can close the door up and then we can install the roof-steel/end-walls ...... Kin -------- Forwarded Message -------- Subject: Heat shield and Insulation blanket Date: Fri, 11 Aug 2017 14:38:03 -0400 From: Ceruti, Raymond B <rayc AT bnl.gov> To: Yip, Kin <kinyip AT bnl.gov> CC: Anerella, Michael D <mda AT bnl.gov>, Wanderer, Peter <wanderer AT bnl.gov>, Phillips, David B <phillips AT bnl.gov> Hi All,
The solenoid connection box is complete except for the two doors left off for now. After everyone is satisfied that all electrical and instrumentation readings are as they should be, we shall install the doors with confidence that the assemble can move forward.
Regards, Ray
|