[Sphenix-magnet-l] Lower staircase installed ... Making the Al cradle to raise/reposition the Magnet
- From: "Yip, Kin" <kinyip AT bnl.gov>
- To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Subject: [Sphenix-magnet-l] Lower staircase installed ... Making the Al cradle to raise/reposition the Magnet
- Date: Thu, 21 Sep 2017 02:18:15 +0000
Hello,
This picture : https://collab.external.bnl.gov/sites/sPHENIX-Magnet/Pictures/High%20Field%20Test/2017-9-20.jpg
was taken shortly after ~7 pm and you can see that the lower staircase was installed to lower platform today. The other staircase has also been assembled (probably since the end of last week) but just not installed yet.
[ The cable above the staircase belongs to the Cryo group (Richard Meier), connecting a couple signals from the plant to the Cryo rack. It seems to be in the way … ]
On another matter, Ed gave us the RFQ# yesterday afternoon for Jon Hock to arrange with the Central Shop (BNL) to make an Al cradle to raise the Magnet to hopefully fix the observed change of the Cryostat dimension.