[Sphenix-magnet-l] To run (the High-Field Test) again tomorrow at 9 am.
- From: Kin Yip <kinyip AT bnl.gov>
- To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Subject: [Sphenix-magnet-l] To run (the High-Field Test) again tomorrow at 9 am.
- Date: Mon, 12 Feb 2018 11:50:06 -0500
Hello, As we do the reconfiguration below this afternoon, tomorrow morning, we'll run the High-Field Test again tomorrow (Tuesday) at 9 am. Kin On 02/12/2018 10:08 AM, Schultheiss,
Carl wrote:
Hi,
On Friday we experienced two interlock events. One at 2800 Amps and the second at 4040 Amps. The first was traced to an intermittent voltage tap, VT10. This tap remained open for a period of time after the interlock, and then reconnected. The second interlock was also due to VT10. The signature can be seen in all the signals that share this voltage tap. The signals are Negative Magnet Lead, the Inner Coil, and the Total Coil. A precursor to the event can be seen on the previous ramp. After this event the voltage tap appeared to be connected again. This tap is unreliable and must be removed from the quench system. The signals presently picked up at VT 10 will be moved to VT20. These signals are listed above. The coil voltages from the inner and outer coils are compared, through a scale factor, and are required to remain less than a threshold during ramping. To preserve the comparison the Outer Coil signal, and the Total Coil signal will also be moved from VT06 to VT19. This is necessary because the magnet leads develop voltages during ramping that will now be included in the measured coil voltages. The inductances of the coils will be adjusted by adding 8.79 mH to their previous values. This is the apparent inductance of the leads. This scheme will reduce the localization of any real quenches, if they occur, but will allow Us to continue.
Carl Schultheiss Principal Electrical Engineer Collider-Accelerator Department Brookhaven National Laboratory
_______________________________________________ sPHENIX-magnet-l mailing list sPHENIX-magnet-l AT lists.bnl.gov https://lists.bnl.gov/mailman/listinfo/sphenix-magnet-l |
-
[Sphenix-magnet-l] sPhenix Voltage Tap,
Schultheiss, Carl, 02/12/2018
- [Sphenix-magnet-l] To run (the High-Field Test) again tomorrow at 9 am., Kin Yip, 02/12/2018
Archive powered by MHonArc 2.6.24.