sphenix-magnet-l AT lists.bnl.gov
Subject: sPHENIX discussion of the superconducting solenoid
List archive
[Sphenix-magnet-l] Strain gauge (and linear pot) cables disconnected
- From: "Yip, Kin" <kinyip AT bnl.gov>
- To: "Pekrul, Winston" <wpekrul AT bnl.gov>
- Cc: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Subject: [Sphenix-magnet-l] Strain gauge (and linear pot) cables disconnected
- Date: Wed, 14 Nov 2018 21:42:40 +0000
I have pulled out the cables and they are both 60 ft long.
The strain gauge cable details are found on Tom Tallerico’s drawings:
Number: 5065E005 Pages 1, 2 and 3.
Frank
From: Yip, Kin
Sent: Wednesday, November 14, 2018 1:50 PM
To: Toldo, Frank A >
Subject: Re: Can your tech handles the upper spring ?
Hi,
After you disconnect, can you measure how long these cables are ?
You have Paul's diagram, right ? File or print.
Sent from my Verizon LG Smartphone
------ Original message------
From: Toldo, Frank A
Date: Wed, Nov 14, 2018 1:18 PM
To: Yip, Kin;
Cc:
Subject:RE: Can your tech handles the upper spring ?
Kin,
I will remove the 2 cables we spoke about and bring them back here for safe keeping. But again, I think it will be a good idea to make new cables due to the fact that one was broken already and that we are not sure if these will be long enough for the permanent installation.
Also Paul told me that his prints are on file.
Frank
From: Yip, Kin
Sent: Wednesday, November 14, 2018 12:52 PM
To: Haggerty, John <haggerty AT bnl.gov< a="">>; Toldo, Frank A </haggerty AT bnl.gov<><fatoldo AT bnl.gov< a="">>; Biggs, John C </fatoldo AT bnl.gov<><biggs AT bnl.gov<
a="">></biggs AT bnl.gov<>
Cc: Anerella, Michael D <mda AT bnl.gov< a="">>; Mills, James A </mda AT bnl.gov<><mills AT bnl.gov< a="">></mills AT bnl.gov<>
Subject: Re: Can your tech handles the upper spring ?
Hi,
With my headache on, I just remember that John Haggerty has promised that their PHENIX group will pack and safe guard the valve box, doghouses etc. somewhere in 1008.
Sent from my Verizon LG Smartphone
------ Original message------
From: Anerella, Michael D
Date: Wed, Nov 14, 2018 10:11 AM
To: Yip, Kin;Mills, James A;
Cc:
Subject:RE: Can your tech handles the upper spring ?
Kin,
We should be able to perform the work. I didn’t plan to safeguard your parts for several years.
Cheers,
Mike
From: Yip, Kin
Sent: Wednesday, November 14, 2018 10:00 AM
To: Mills, James A <mills AT bnl.gov< a="">>; Anerella, Michael D </mills AT bnl.gov<><mda AT bnl.gov< a="">></mda AT bnl.gov<>
Subject: FW: Can your tech handles the upper spring ?
Hi,
On the other hand, when I asked Mike Anerella whether we should find some C-AD magnet experts to help (doing those superconducting joints and wrapping them up like what Ray did etc.), he said that they (in Magnet Div.) will take care of this in the future. You may confirm with him in the meeting.
Kin
From: Yip, Kin
Sent: Wednesday, November 14, 2018 9:36 AM
To: Ceruti, Raymond B <rayc AT bnl.gov>
Cc: Phillips, David B <phillips AT bnl.gov>; Mills, James A <mills AT bnl.gov>; Streckenbach, Brian <bstreckenbach AT bnl.gov>
Subject: RE: Can your tech handles the upper spring ?
Hi, Ray,
Thanks. Brian said that he’d take video etc. and he should be able to be responsible for keeping all the various parts ….
- will be some time in the future
When will you be more free to do this work ?? End of Nov. , Dec. or later ??
Kin
From: Ceruti, Raymond B
Sent: Wednesday, November 14, 2018 7:30 AM
To: Yip, Kin <kinyip AT bnl.gov>
Cc: Phillips, David B <phillips AT bnl.gov>; Mills, James A <mills AT bnl.gov>
Subject: RE: Can your tech handles the upper spring ?
Hi Kin,
I’m sure our techs can handle the lift off of the valve box both upper and lower parts involved and will work with the riggers directly. The actual removal I hope will be some time in the future as we are all very busy now and there will be a commitment of effort before the actual removal day. Who will take charge and be responsible for all the various parts that will be necessary for installment in the future? There is a good possibility that I won’t be around then and therefore can’t guarantee their safe keeping.
See you at the meeting,
Ray
From: Yip, Kin
Sent: Tuesday, November 13, 2018 9:08 PM
To: Ceruti, Raymond B <rayc AT bnl.gov>
Cc: Phillips, David B <phillips AT bnl.gov>; Mills, James A <mills AT bnl.gov>
Subject: Can your tech handles the upper spring ?
Hi,
Dave told me that if your tech. can handle the upper spring, it’s relative easier to find the riggers to move the Valvebox. The C-AD tech. installed the spring during
the installation. Now, to take it apart is easier. Can you guys do it in addition to handle the part below ??
Dave tried to reach you earlier and I’m not sure whether you guys have talked.
Kin
- [Sphenix-magnet-l] Strain gauge (and linear pot) cables disconnected, Yip, Kin, 11/14/2018
Archive powered by MHonArc 2.6.24.