sphenix-magnet-l - [Sphenix-magnet-l] Jim Mills' Minutes for sPHENIX Magnet (Nov. 14, 2018) at 902A conference at 1:30 pm

sphenix-magnet-l AT lists.bnl.gov

Subject: sPHENIX discussion of the superconducting solenoid

List archive

Chronological Thread  
  • From: "Yip, Kin" <kinyip AT bnl.gov>
  • To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
  • Subject: [Sphenix-magnet-l] Jim Mills' Minutes for sPHENIX Magnet (Nov. 14, 2018) at 902A conference at 1:30 pm
  • Date: Thu, 15 Nov 2018 15:36:24 +0000

Hello,

 

Below are the minutes that Jim Mills has taken.  Thanks.  

 

I have also attached Roberto’s outline for the Technical/LESHC-PCSS review on Dec 5, 2018.   Please let us know if you have any comments.

I won’t be there on Dec. 5 due to personal vacation (planned 9 months ago).

 

Kin

 

_____________________________________________
From: Mills, James A
Sent: Thursday, November 15, 2018 9:21 AM
To: Yip, Kin <kinyip AT bnl.gov>
Cc: Mills, James A <mills AT bnl.gov>
Subject: RE: Please help with the meeting

 

 

Hi Kin,

 

We had the meeting and here are the minutes for your use:

 

Present:  Tom T., Carl S., Ray C., Paul O., Roberto T., Brian S., Mike A.

 

Tentative Schedule:

 

Beginning January 2019 – Rigging to set up blocks for VB storage, Carpenters to remove wood decking on platform, Electricians to remove 535 MCM cable (if needed, Carl will check)

 

Mid-January 2019 – Disconnect and remove V/B – SMD techs, riggers, cryo (~2-3 days)

 

End of February 2019 – Start repairs – Carl et al.

 

Ray will take pictures as he goes during the disassembly, video will be taken for the 5 mil indium spacer removal that separates the buss.  Tom T. volunteered his Go-Pro if needed.  We could use lab videographers.  This should be sorted out prior to the start of the VB removals.

 

Need to pick location for the VB storage in B912.

 

Need to make estimate of how much storage space is needed for part – pallet/box.  This should go out to B1008 and be under the control of Carter Biggs (sPHENIX).

 

Try to have meeting before the holiday break in December to finalize plan.

 

 

Hope your feeling better,

Jim

 

_____________________________________________
From: Yip, Kin
Sent: Wednesday, November 14, 2018 9:43 AM
To: Mills, James A <mills AT bnl.gov>
Cc: Streckenbach, Brian <bstreckenbach AT bnl.gov>
Subject: Please help with the meeting

 

 

Hi Jim,

 

I’ve just typed/sent the meeting reminder (email).   I feel painful and dizzy … It looks like that I can’t come.  Can you please help with the meeting

as you’ve offered ??

 

Kin

 

_____________________________________________
From: Mills, James A
Sent: Tuesday, November 13, 2018 8:56 PM
To: Yip, Kin <kinyip AT bnl.gov>
Subject: RE: Meet to discuss the sPHENIX Cryo/IP/Infrastructure Interface

 

 

Hi Kin,

 

I hope you feel better.  I have had a cold for over a week.  I think we are all getting sick.  :-) 

 

No problem about the meeting tomorrow.  I can fill you in on what is discussed.  The same holds true for the afternoon meeting if you find that you just want to stay home.  I can go and take notes and fill you in on this meeting as well.  Just let me know.

 

Feel better Kin,

Jim

 

_____________________________________________
From: Yip, Kin
Sent: Tuesday, November 13, 2018 8:39 PM
To: Mills, James A <mills AT bnl.gov>
Subject: RE: Meet to discuss the sPHENIX Cryo/IP/Infrastructure Interface

 

 

Hi Jim,

 

I’m fighting with a headache (and at times fever).   I may not be able to can to your meeting  in the morning.

 

I’ll try my best to go to the 1:30 pm one.

 

Kin

 

-----Original Appointment-----
From: Mills, James A
Sent: Tuesday, November 13, 2018 2:57 PM
To: Giannotti, Paul; Lynch, Don; Ruggiero, Richard; Streckenbach, Brian; Orfin, Paul; Than, Yatming (Roberto); Meier, Robert S; Phillips, David B; Haggerty, John; Yip, Kin; Schultheiss, Carl; Hock, Jonathan; Folz, Charles; Tuozzolo, Joseph E; Chiu, Mickey; Pontieri, Chris; O'Brien, Edward; Young, Glen
Subject: Meet to discuss the sPHENIX Cryo/IP/Infrastructure Interface
When: Wednesday, November 14, 2018 10:30 AM-12:00 PM (UTC-05:00) Eastern Time (US & Canada).
Where: 2-219 PHYSICS

 

 

Hi,

 

Just a reminder that we will be meeting tomorrow in room 2-219.

 

Thanks,

Jim

 

 

Hi,

 

I would like to propose that we restart our PHENIX Cryo/IP/Infrastructure Interface meetings.  For our meeting on Wednesday, 11/14, let’s catch up on the following:

 

  1. Current design of the cradle/carriage system, including platforms, stairs, and pole tips (Jon can you provide slides of our latest layout please).
  2. Cryo piping design layout both inside and outside the IR, including latest concept of the new valve box arrangement on the platform (Roberto, Paul, and Bob can you please provide your latest layout of the cryo runs both inside and outside 1008).
  3. Current thoughts of rack locations on the upper, mid, and lower levels of the platform (Mickey and John, could you please provide the current rack layout).
  4. Current thoughts on tray routing, water, and power (Paul can you please put together your tentative plans for cable tray routing).

 

 

At a near-future meeting I think we should also start talking about a system-wide global grounding plan that will need to be folded into some of our current designs; for example grounding/electrically insulating the cradle carriage. 

 

 

Please let me know if you can make it.

 

Thanks,

Jim

 

Attachment: sPHENIX cryo 11-14-2018.pptx
Description: sPHENIX cryo 11-14-2018.pptx



  • [Sphenix-magnet-l] Jim Mills' Minutes for sPHENIX Magnet (Nov. 14, 2018) at 902A conference at 1:30 pm, Yip, Kin, 11/15/2018