I send this newly required monthly report back to our mailing list for record.
Kin
-------- Original message --------
From: "O'Brien, Edward" <eobrien AT bnl.gov>
Date: 11/12/19 18:57 (GMT-05:00)
To: "O'Brien, Edward" <eobrien AT bnl.gov>, Glenn Young <glennyoung82251 AT gmail.com>, "Lavelle, Cathleen B" <lavellec AT bnl.gov>, "Haggerty, John" <haggerty AT bnl.gov>, "Mills, James A" <mills AT bnl.gov>, "Feder, Russell" <rfeder AT bnl.gov>, "Sourikova,Irina V" <irina AT bnl.gov>,
"Gutta, Rajendra Rao" <rgutta AT bnl.gov>, "Yip, Kin" <kinyip AT bnl.gov>, "Than, Yatming (Roberto)" <ythan AT bnl.gov>, "Orfin, Paul" <porfin AT bnl.gov>, "Schultheiss, Carl" <carls AT bnl.gov>, "Anerella, Michael D" <mda AT bnl.gov>, "Pontieri, Chris" <cpontieri AT bnl.gov>,
"Pisani, Robert" <pisani AT bnl.gov>, "Streckenbach, Brian" <bstreckenbach AT bnl.gov>, "Phillips, David B" <phillips AT bnl.gov>, "Gortakowski, Charles" <cgortakowski AT bnl.gov>, "Stiegler, Lori" <stiegler AT bnl.gov>, "Hock, Jonathan" <jhock AT bnl.gov>, "Vasquez, Joel"
<jvasquez AT bnl.gov>
Subject: September Status report for 2.X
Hi all,
The monthly status report for the sPHENIX 2.X is attached.
It came out well. Thank you for your contributions. For future
reports I'll ask each L2 Manager to contribute a figure as appropriate
but it wasn't necessary for this month's report.
By the way, in case you are wondering, this is the September report
because the financial figures are from the September close. There
is always
a few week lag between the end of the month and the production
of the Cost Performance Report for that month due to the statusing
process and the analysis.
Ed
The monthly status report for the sPHENIX 2.X is attached.
It came out well. Thank you for your contributions. For future
reports I'll ask each L2 Manager to contribute a figure as appropriate
but it wasn't necessary for this month's report.
By the way, in case you are wondering, this is the September report
because the financial figures are from the September close. There
is always
a few week lag between the end of the month and the production
of the Cost Performance Report for that month due to the statusing
process and the analysis.
Ed
Attachment:
sPHENIX_I&Fstatus_111419.docx
Description: sPHENIX_I&Fstatus_111419.docx
- [Sphenix-magnet-l] Fwd: September Status report for 2.X, Yip, Kin, 11/12/2019
Archive powered by MHonArc 2.6.24.