sphenix-magnet-l AT lists.bnl.gov
Subject: sPHENIX discussion of the superconducting solenoid
List archive
- From: "Yip, Kin" <kinyip AT bnl.gov>
- To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Subject: Re: [Sphenix-magnet-l] nitrogen flushing status ?
- Date: Sat, 4 Jan 2020 19:39:45 +0000
Hi,
Thanks ! I send this email chain back to the mailing list for record.
Kin
From: Orfin, Paul <porfin AT bnl.gov>
I will check the status of the valve box purge on Monday when I return to the office. Thank you, Paul Orfin Cryogenic Systems, Collider-Accelerator Department Brookhaven National Laboratory Telephone: (631) 344-2899 E-mail: porfin AT bnl.gov
From: Yip, Kin <kinyip AT bnl.gov>
Hi Paul,
Thanks a lot ! Have you also flushed nitrogen in the Valvebox ?? I remember Roberto mentioned wanting to do that some time ago …
Kin
From: Orfin, Paul <porfin AT bnl.gov>
Sorry, I forgot to send out a message. Nitrogen flush was done the Friday before Christmas. Two days of flushing with the spring relief on for safety. System was sealed on that Friday with the relief still in place. Thank you, Paul Orfin Cryogenic Systems, Collider-Accelerator Department Brookhaven National Laboratory Telephone: (631) 344-2899 E-mail: porfin AT bnl.gov
From: Yip, Kin <kinyip AT bnl.gov>
Hi Paul,
What’s the status of the nitrogen flushing business for the Magnet in 912 ???
Kin |
- Re: [Sphenix-magnet-l] nitrogen flushing status ?, Yip, Kin, 01/04/2020