Skip to Content.
Sympa Menu

sphenix-magnet-l - [Sphenix-magnet-l] Carl did another hipot → leak check

sphenix-magnet-l AT lists.bnl.gov

Subject: sPHENIX discussion of the superconducting solenoid

List archive

Chronological Thread  
  • From: "Yip, Kin" <kinyip AT bnl.gov>
  • To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
  • Cc: "Warkentien, Andreas F" <andyw AT bnl.gov>, "Sheth, Chintan" <csheth AT bnl.gov>, "Decker, Kenneth" <kdecker AT bnl.gov>, "O'Connor, Eric" <eoconnor1 AT bnl.gov>
  • Subject: [Sphenix-magnet-l] Carl did another hipot → leak check
  • Date: Wed, 27 Jul 2022 19:29:30 +0000

Hi,

Before 3 pm, Carl did another hipot successfully for the Magnet.
This time, Carl and his tech brought a fancier meter and the ramp was finished in 104 seconds (as it is 5V / s).  We dwelled for 1 minute.  I took a picture of their setup.

So now, the cryo/vacuum group can do the leak check.

( I am thinking ... The obvious places for leaks includes the doors and the connector underneath the Doghouse because it was turned 90 deg. earlier this week 😀 )

Kin

Attachment: 20220727_145431.jpg
Description: 20220727_145431.jpg



  • [Sphenix-magnet-l] Carl did another hipot → leak check, Yip, Kin, 07/27/2022

Archive powered by MHonArc 2.6.24.

Top of Page