Re: [Sphenix-magnet-l] Hipot Done today ... Carl request that you don't go above 500 amp before he's in BNL
- From: "Yip, Kin" <kinyip AT bnl.gov>
- To: "Michnoff, Robert J" <michnoff AT bnl.gov>, "Mills, James A" <mills AT bnl.gov>, "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>, "Schultheiss, Carl" <carls AT bnl.gov>
- Cc: "Vasquez, Joel" <jvasquez AT bnl.gov>, "Albanese, Marianna" <malbanese AT bnl.gov>, "Minty, Michiko" <minty AT bnl.gov>, "Mandracchia, Kevin" <kmandracchia AT bnl.gov>, "Lehn, Robert D" <lehn AT bnl.gov>, "Curcio, Anthony J" <curcio AT bnl.gov>
- Subject: Re: [Sphenix-magnet-l] Hipot Done today ... Carl request that you don't go above 500 amp before he's in BNL
- Date: Sun, 23 Oct 2022 20:25:40 +0000
Hi,
Not exactly ...
Tomorrow, it's Pablo who needs to do the compensation work for before Carl can start his work in earnest.
Pablo needs some time to prepare anyway and to go from 0 to 500 amp. 11 am at 500 amp may not be too much a delay.
I mean, it's possible that by 11 am, Pablo may still be < 500 amp. Only Pablo can tell ...
Kin
-------- Original message --------
From: "Michnoff, Robert J" <michnoff AT bnl.gov>
Date: 10/23/22 4:17 PM (GMT-05:00)
To: "Mills, James A" <mills AT bnl.gov>, "Yip, Kin" <kinyip AT bnl.gov>, sphenix-magnet-l AT lists.bnl.gov, "Schultheiss, Carl" <carls AT bnl.gov>
Cc: "Albanese, Marianna" <malbanese AT bnl.gov>, "Minty, Michiko" <minty AT bnl.gov>, "Curcio, Anthony J" <curcio AT bnl.gov>, "Lehn, Robert D" <lehn AT bnl.gov>, "Mandracchia, Kevin" <kmandracchia AT bnl.gov>, "Vasquez, Joel" <jvasquez AT bnl.gov>
Subject: Re: Hipot Done today ... Carl request that you don't go above 500 amp before he's in BNL
Kin,
Thanks for the update. Just so I understand, if Carl is coming in at 11am tomorrow, is that when the magnet test will now begin instead of the original 8:30 plan? Can other work be performed before he arrives?
Rob
From: Mills, James A <mills AT bnl.gov>
Sent: Sunday, October 23, 2022 4:05 PM
To: Yip, Kin <kinyip AT bnl.gov>; sphenix-magnet-l AT lists.bnl.gov <sphenix-magnet-l AT lists.bnl.gov>
Cc: Michnoff, Robert J <michnoff AT bnl.gov>; Albanese, Marianna <malbanese AT bnl.gov>
Subject: Re: Hipot Done today ... Carl request that you don't go above 500 amp before he's in BNL
Nice job guys. Thank you!
Sent: Sunday, October 23, 2022 4:05 PM
To: Yip, Kin <kinyip AT bnl.gov>; sphenix-magnet-l AT lists.bnl.gov <sphenix-magnet-l AT lists.bnl.gov>
Cc: Michnoff, Robert J <michnoff AT bnl.gov>; Albanese, Marianna <malbanese AT bnl.gov>
Subject: Re: Hipot Done today ... Carl request that you don't go above 500 amp before he's in BNL
Sent from my Verizon, Samsung Galaxy smartphone
Get Outlook for Android
Get Outlook for Android
From: sPHENIX-magnet-l <sphenix-magnet-l-bounces AT lists.bnl.gov> on behalf of Yip, Kin <kinyip AT bnl.gov>
Sent: Sunday, October 23, 2022 4:00:38 PM
To: sphenix-magnet-l AT lists.bnl.gov <sphenix-magnet-l AT lists.bnl.gov>
Cc: Michnoff, Robert J <michnoff AT bnl.gov>; Albanese, Marianna <malbanese AT bnl.gov>
Subject: [Sphenix-magnet-l] Hipot Done today ... Carl request that you don't go above 500 amp before he's in BNL
Sent: Sunday, October 23, 2022 4:00:38 PM
To: sphenix-magnet-l AT lists.bnl.gov <sphenix-magnet-l AT lists.bnl.gov>
Cc: Michnoff, Robert J <michnoff AT bnl.gov>; Albanese, Marianna <malbanese AT bnl.gov>
Subject: [Sphenix-magnet-l] Hipot Done today ... Carl request that you don't go above 500 amp before he's in BNL
Hi Pablo,
Sorry for the previous incomplete message.
Early in the morning, because of some doubt of Carl (after reading the new/temporary LOTO instructions attached to that box to go up to the platform), I called Eric Johanssen and he agreed that we could do the hipot as we planned. ( I also talked
with Joel and Tom. )
It took Carl a while (in both 1008 platform and 1008B) to understand what he measured by fluke meter. Carl forgot he put a jumper between two voltage taps when the Current Lead voltage taps were not connected. Carl said that this is why we
do hipot 😁
We also asked CAS (Ron Walker) to help disconnect the snubber circuits.
At the end, under the rain, the 520 V hipot (for the entire system) passed with 65 microamp leakage current → ~ 8 Mohm.
I put the switch back to "grounded" in the dump resistor (as I switched it to "ungrounded" for hipot). I reconnected J6 cable back as I disconnected it earlier. Ron put the snubbers (and that small relay we took out) back. So , everything
was back to where it was. Except that I left the contactors in the "opened" state (it was "closed" when I first arrived).
On Monday, Carl has a medical appointment. He will be at the Lab. around/at 11 am.
Carl requests:
1. Please don't "force" the quench detector into the "good" state when you do compensation, as everything is real now. I left it running in good state.
2. Carl asks that you don't go above 500 amp before he comes to BNL . He wants to check the quench detector (and He gas flow in the Leads).
I hope you can accommodate him 😀
Today, I arrived before 12 pm and now it's almost 4 pm. Carl was probably here soon after 11 am.
Kin
-
[Sphenix-magnet-l] Hipot Done today ... Carl request that you don't go above 500 amp before he's in BNL,
Yip, Kin, 10/23/2022
-
Re: [Sphenix-magnet-l] Hipot Done today ... Carl request that you don't go above 500 amp before he's in BNL,
Mills, James A, 10/23/2022
-
Message not available
- Re: [Sphenix-magnet-l] Hipot Done today ... Carl request that you don't go above 500 amp before he's in BNL, Yip, Kin, 10/23/2022
-
Message not available
-
Re: [Sphenix-magnet-l] Hipot Done today ... Carl request that you don't go above 500 amp before he's in BNL,
Mills, James A, 10/23/2022