sphenix-maps-l AT lists.bnl.gov
Subject: sPHENIX MAPS tracker discussion
List archive
[Sphenix-maps-l] FW: Results from the Director's Review
- From: Ming Liu <ming AT bnl.gov>
- To: sphenix-mvtx-l <sphenix-maps-l AT lists.bnl.gov>
- Subject: [Sphenix-maps-l] FW: Results from the Director's Review
- Date: Thu, 11 Apr 2019 22:53:22 -0400
FYI,
I thought we had a very good review for MVTX this week, see the summary from
Ed.
After the review, I had a follow-up discussion with Ed, John H. and Glenn et
al. Here is a short action list for near term activities:
1. prepare for a MVTX cost & schedule review (sPHENIX internal or higher
level) in ~mid June after the PD2/3 review (5/29-31), update the P6 with the
latest C&S developed after the MVTX/HF workshop at LBNL in March.
2. update project management plan (PMP), risk registry, WBS dictionary and
BoE documents. sPHENIX project team will help to enter them into P-6
3. submit funding breakout to sPHENIX/BNL management for FY19, for LANL,
MIT, LBNL, UT-A et al, including design and test/QA efforts etc.
We will skip MVTX bi-weekly meeting tomorrow.
Cheers,
Ming
--
Ming Xiong Liu
P-25, MS H846 TEL: 505-667-7125
Physics Division 631-344-7821(BNL)
LANL 630-840-5708(FNAL)
Los Alamos, NM 87545 FAX: 505-665-7020
On 4/11/19, 7:13 PM, "EdwardOBrien" <eobrien AT bnl.gov> wrote:
Dear all,
I want to thank you all for the tremendous effort you put
into preparing for the Director's review. We prepared
60 talks from 47 different speakers and posted over 60
separate documents for the review. The talks as a whole
did an excellent job communicating to the review committee
the maturity of our design and our preparedness for
proceeding to baselining and production.
The main conclusion of the review is that the sPHENIX project is
ready for a PD-2/3 review. That was our primary goal for
the review and we obtained it. We have six and one half weeks
to get ready for the PD-2/3 review. This was a good practice
for us and a thorough vetting of our talks and documents.
We have some follow-up work to do to prepare for the
PD-2/3 review, but we'll be ready. Congratulations to all
on a good outcome and on to the next review.
Ed
- [Sphenix-maps-l] FW: Results from the Director's Review, Ming Liu, 04/11/2019
Archive powered by MHonArc 2.6.24.