sphenix-maps-l AT lists.bnl.gov
Subject: sPHENIX MAPS tracker discussion
List archive
[Sphenix-maps-l] Highlights from Fermilab MVTX test beam
- From: Ming Liu <ming AT bnl.gov>
- To: sPHENIX LDRD <sphenix-ldrd AT lanl.gov>, sphenix-mvtx-l <sphenix-maps-l AT lists.bnl.gov>
- Cc: Mandy Kathleen Rominsky <rominsky AT fnal.gov>
- Subject: [Sphenix-maps-l] Highlights from Fermilab MVTX test beam
- Date: Wed, 22 May 2019 07:04:37 -0500
Dear all,
A lot of progress at Fermilab this week, accomplished pretty much all of the primary goals in the last two days and confirmed the full readout chain with the (near final) hardware:
4-stave telescope + Custom SamTec cables (11.4m long) + 2 RUv1.1 (electrically identical to the final RU) + Felix v 2.0 (final) + sPHENIX GTM (v0.1) + RCDAQ
We received the custom long SamTec cable yesterday (just in time!) and tested them this evening. The longest SamTec cable combination: 2.6m+8.8m = 11.4m long (10m is the desired length), and we confirmed the performance is not different from others!
More detailed analysis will follow soon.
A few fun photos of the even display,
MVTX test beam web page, https://p25ext.lanl.gov/maps/beamtest_2019/index.html
Xiaochun is also updating the sPHENIX MVTX wikipage, https://wiki.bnl.gov/sPHENIX/index.php/Test_beam_in_2019_at_FNAL
Cheers, Ming for the MVTX Test Beam team
-- Ming Xiong Liu P-25, MS H846 TEL: 505-667-7125 Physics Division 631-344-7821(BNL) LANL 630-840-5708(FNAL) Los Alamos, NM 87545 FAX: 505-665-7020
|
-
[Sphenix-maps-l] Highlights from Fermilab MVTX test beam,
Ming Liu, 05/22/2019
-
Re: [Sphenix-maps-l] Highlights from Fermilab MVTX test beam,
Xin Dong, 05/22/2019
- Re: [Sphenix-maps-l] Highlights from Fermilab MVTX test beam, Ming Liu, 05/23/2019
- Re: [Sphenix-maps-l] Highlights from Fermilab MVTX test beam, EdwardOBrien, 05/24/2019
-
Re: [Sphenix-maps-l] Highlights from Fermilab MVTX test beam,
Xin Dong, 05/22/2019
Archive powered by MHonArc 2.6.24.